Quick answers
What is this project?
Proposed Sand Mining Project of Area 22.4 Ha at Block 36 Aurangabad MoEF Sone-5-F Sand Ghat on Sone River of District- Aurangabad, State- Bihar is an approved mining project in Naur, Nabinagar, Aurangabad, Bihar. The site covers 55.4 acres.
Who is building it?
The applicant is Sachidanand Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2026), as of 27 Nov 2026.
Where is it?
In Naur, Nabinagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹10.8 crore and a site of 55.4 acres.
When was it filed?
The application was filed on 27 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2026 |
| Application filed | 27 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sachidanand Singh |
| Land area | 55.4 acres (22.4 ha) |
| Project cost | ₹10.8 crore |
| Village / locality | Naur |
| Taluk / tehsil | Nabinagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02449 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jan 2026 (this page) | Environmental approval granted | 55.4 acres | ₹10.8 crore |
| Early planning filed 24 Jun 2025 | Cleared for impact study | 55.4 acres | ₹10.8 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 55.4 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Naur, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 22.4 Ha at Block 36 Aurangabad MoEF… — cleared for impact study, 0 m away
- Proposed Sand Mining Project Aurangabad MOEF Sone- 6 Sand Ghat on Sone River… — environmental approval granted, 1.2 km away
- Proposed Sand Mining Project Aurangabad MOEF Sone- 6 Sand Ghat on Sone River… — cleared for impact study, 1.2 km away
- Proposed Brick Earth Mining for M/S ELECOM ENGINEERS - Thengo Soil Brick… — environmental approval granted, 1.8 km away
- Nabinagar Thermal Power Project — lapsed, 7.3 km away
- For Constructing Approach Road to the Plant Rob for Fly Ash Transportation. — more information requested, 7.9 km away
- Aurangabad Block 32 (Aurangabad MoEF Son 1F) Sand Ghat at Mauja– Mahuaon P.O +… — cleared for impact study, 12.5 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — more information requested, 13.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.