Quick answers
What is this project?
Aurangabad Block 32 (Aurangabad MoEF Son 1F) Sand Ghat at Mauja– Mahuaon P.O + P.S+ Anchal - Nabinagar, District- Aurangabad (Bihar) is a proposed mining project in Barem G.P., Nabinagar, Aurangabad, Bihar. The site covers 73.9 acres.
Who is building it?
The applicant is Maa Laxmi Transport Co.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Jun 2026), as of 27 Nov 2026.
Where is it?
In Barem G.P., Nabinagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹9 crore and a site of 73.9 acres.
When was it filed?
The application was filed on 21 May 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Jun 2026 |
| Application filed | 21 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Maa Laxmi Transport Co |
| Land area | 73.9 acres (29.9 ha) |
| Project cost | ₹9 crore |
| Village / locality | Barem G.P. |
| Taluk / tehsil | Nabinagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01832 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 73.9 acres, this one is larger than 54% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Barem G.P., Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.-… — withdrawn, 2 km away
- Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.-… — cleared for impact study, 2 km away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — environmental approval granted, 3.4 km away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — cleared for impact study, 3.4 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — more information requested, 3.9 km away
- Nabinagar Thermal Power Project — lapsed, 6.3 km away
- For Constructing Approach Road to the Plant Rob for Fly Ash Transportation. — more information requested, 7.6 km away
- Nabinagar Super Thermal Power Station — withdrawn, 8.8 km away
More from Maa Laxmi Transport Co in Aurangabad
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — environmental approval granted
- Project: Aurangabad Son 13 - B Sand Ghat, (Area- 26.0 Ha) Production-498600… — cleared for impact study
All 3 Maa Laxmi Transport Co projects across India