What is this project?
Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Bpcl on Khata No.-10, Plot No.- 2710, 2711, Thana No.-28, Thana-O.P. Badem (Nabinagar), Mouza-Kanker to Barun-Nabinagar M.D.R Road is a proposed fuel station in Kanker, Nabinagar, Aurangabad, Bihar. The site covers 0.4 acres.
Who is building it?
The applicant is Pankaj Kumar Singh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kanker, Nabinagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.4 acres and 140 m² of forest land.
When was it filed?
The application was filed on 17 Jun 2026.
Project details
| Official title | Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Bpcl on Khata No.-10, Plot No.- 2710, 2711, Thana No.-28, Thana-O.P. Badem (Nabinagar), Mouza-Kanker to Barun-Nabinagar M.D.R Road in Aurangabad District of Bihar. |
|---|---|
| Status | More information requested |
| Status since | 19 Nov 2026 |
| Application filed | 17 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Pankaj Kumar Singh |
| Land area | 1,500 m² |
| Forest land | 140 m² |
| Project cost | ₹60 lakh |
| Village / locality | Kanker |
| Taluk / tehsil | Nabinagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02943 |
In context
10 applications in Aurangabad since January 2022 are in the same category (Fuel stations): 0 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 0.4 acres, this one is smaller than 90% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanker, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Aurangabad Block 32 (Aurangabad MoEF Son 1F) Sand Ghat at Mauja– Mahuaon P.O +… — cleared for impact study, 3.9 km away
- Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.-… — withdrawn, 3.9 km away
- Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.-… — cleared for impact study, 3.9 km away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — environmental approval granted, 4.5 km away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — cleared for impact study, 4.5 km away
- Nabinagar Thermal Power Project — lapsed, 6.1 km away
- For Constructing Approach Road to the Plant Rob for Fly Ash Transportation. — more information requested, 6.4 km away
- Nabinagar Super Thermal Power Station — withdrawn, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.