Quick answers
What is Nabinagar Thermal Power Project?
Nabinagar Thermal Power Project is a lapsed power project in Kerka, Nabinagar, Aurangabad, Bihar. The site covers 1,526.1 acres.
Who is building it?
The applicant is Bhartiya Rail Bijlee Company Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Kerka, Nabinagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹10,566 crore and a site of 1,526.1 acres.
When was it filed?
The application was filed on 19 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 19 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Bhartiya Rail Bijlee Company Limited |
| Land area | 1,526.1 acres (617.6 ha) |
| Project cost | ₹10,566 crore |
| Village / locality | Kerka |
| Taluk / tehsil | Nabinagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00666 |
In context
7 applications in Aurangabad since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kerka, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- For Constructing Approach Road to the Plant Rob for Fly Ash Transportation. — more information requested, 1.9 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — more information requested, 6.1 km away
- Aurangabad Block 32 (Aurangabad MoEF Son 1F) Sand Ghat at Mauja– Mahuaon P.O +… — cleared for impact study, 6.3 km away
- Proposed Sand Mining Project of Area 22.4 Ha at Block 36 Aurangabad MoEF… — environmental approval granted, 7.3 km away
- Proposed Sand Mining Project of Area 22.4 Ha at Block 36 Aurangabad MoEF… — cleared for impact study, 7.3 km away
- Proposed Brick Earth Mining for M/S ELECOM ENGINEERS - Thengo Soil Brick… — environmental approval granted, 7.9 km away
- Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.-… — withdrawn, 8 km away
- Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.-… — cleared for impact study, 8 km away
More from Bhartiya Rail Bijlee Company Limited in Aurangabad
- For Constructing Approach Road to the Plant Rob for Fly Ash Transportation. — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.