Quick answers
What is this project?
Brick Earth Mining project of M/s D.R.S. Int Udyog at Mauza- Harni, Block- Khaira, District- Jamui (Bihar). (Lease Area: 1.34 Ha.) is a proposed mining project in Harni, Khaira, Jamui, Bihar. The site covers 3.3 acres.
Who is building it?
The applicant is Darogi Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Harni, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 3.3 acres.
When was it filed?
The application was filed on 15 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 15 Oct 2026 |
| Application filed | 15 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Darogi Kumar |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Harni |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02546 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 3.3 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Harni, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project of M/s P.R.M. INT UDYOG at Mauza - Harni,… — environmental approval granted, 1.8 km away
- Proposed Brick Earth Mining Project of M/s R.P.M. INT UDYOG at Mauza - Harni,… — environmental approval granted, 2 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul… — environmental approval granted, 3 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul… — cleared for impact study, 3.1 km away
- Preliminary Exploration for Ree and Rare Metals — forest land use approved, 3.8 km away
- Preliminary Exploration for Ree and Rare Metals — in-principle approval, conditions pending, 3.8 km away
- Preliminary Exploration for Ree and Rare Metals — not approved, 3.8 km away
- Bridge at Km 65+750 (From Km 65+430 to Km 66+100) including approach and… — more information requested, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.