Quick answers
What is this project?
Proposed Brick Earth Mining Project of M/s R.P.M. INT UDYOG at Mauza - Harni, Block - Khaira, District - Jamui, Bihar (Area - 1.45 ha.) is an approved mining project in Harni, Khaira, Jamui, Bihar. The site covers 3.6 acres.
Who is building it?
The applicant is Mahesh Yadav.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Jun 2025), as of 27 Nov 2026.
Where is it?
In Harni, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹8 lakh and a site of 3.6 acres.
When was it filed?
The application was filed on 5 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Jun 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahesh Yadav |
| Land area | 3.6 acres (1.5 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Harni |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00926 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 3.6 acres, this one is smaller than 83% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Harni, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project of M/s P.R.M. INT UDYOG at Mauza - Harni,… — environmental approval granted, 500 m away
- Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul… — environmental approval granted, 1.5 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 01 Sand Ghat) at Riverbed of Kiul… — cleared for impact study, 1.6 km away
- Brick Earth Mining project of M/s D.R.S. Int Udyog at Mauza- Harni, Block-… — initial checks, 2 km away
- Bridge at Km 65+750 (From Km 65+430 to Km 66+100) including approach and… — more information requested, 2.2 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — environmental approval granted, 3.3 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — cleared for impact study, 3.3 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — cleared for impact study, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.