What is Developing? Open the mapMap

WithdrawnMining · Aurangabad, Bihar

Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-C on Sone River of District- Aurangabad, State- Bihar

Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-C on Sone River of District- Aurangabad, State- Bihar is a withdrawn mining project in Mahuawan, Nabinagar, Aurangabad, Bihar. The site covers 86.5 acres. Its stated project cost is ₹10.8 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 4 Feb 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-C on Sone River of District- Aurangabad, State- Bihar is a withdrawn mining project in Mahuawan, Nabinagar, Aurangabad, Bihar. The site covers 86.5 acres.

Who is building it?

The applicant is Uma Associates Infratech Developers Private Limited.

Has it been approved?

No. The application was withdrawn on 4 Feb 2026, so it is no longer under consideration.

Where is it?

In Mahuawan, Nabinagar, Aurangabad, Bihar.

How big is it?

It has a stated cost of ₹10.8 crore and a site of 86.5 acres.

When was it filed?

The application was filed on 4 Feb 2026.

Project details

StatusWithdrawn
Status since4 Feb 2026
Application filed4 Feb 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantUma Associates Infratech Developers Private Limited
Land area86.5 acres (35 ha)
Project cost₹10.8 crore
Village / localityMahuawan
Taluk / tehsilNabinagar
DistrictAurangabad
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-02357

In context

145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 86.5 acres, this one is larger than 81% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Mahuawan, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.