Quick answers
What is this project?
Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-C on Sone River of District- Aurangabad, State- Bihar is a withdrawn mining project in Mahuawan, Nabinagar, Aurangabad, Bihar. The site covers 86.5 acres.
Who is building it?
The applicant is Uma Associates Infratech Developers Private Limited.
Has it been approved?
No. The application was withdrawn on 4 Feb 2026, so it is no longer under consideration.
Where is it?
In Mahuawan, Nabinagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹10.8 crore and a site of 86.5 acres.
When was it filed?
The application was filed on 4 Feb 2026.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 4 Feb 2026 |
| Application filed | 4 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Uma Associates Infratech Developers Private Limited |
| Land area | 86.5 acres (35 ha) |
| Project cost | ₹10.8 crore |
| Village / locality | Mahuawan |
| Taluk / tehsil | Nabinagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02357 |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 86.5 acres, this one is larger than 81% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Mahuawan, Nabinagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 35.0 Ha at Sand Ghat/Block No.-… — cleared for impact study, 0 m away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — environmental approval granted, 1.4 km away
- Proposed Sand Mining Project Sand Ghat/Block No.- Aurangabad 32 MOEF Son-1-A… — cleared for impact study, 1.4 km away
- Aurangabad Block 32 (Aurangabad MoEF Son 1F) Sand Ghat at Mauja– Mahuaon P.O +… — cleared for impact study, 2 km away
- Diversion of 0.0135 Ha of Forest Land for Construction of Approach Road for… — more information requested, 3.9 km away
- Nabinagar Super Thermal Power Station — withdrawn, 7.2 km away
- 3x660 MW Super-Critical Technology Coal Based Nabinagar Thermal Power Plant — returned to applicant, 7.2 km away
- Nabinagar Super Thermal Power Project, Stage-II (3X800 MW) — more information requested, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.