What is Developing? Open the mapMap

Initial checksMining · Pashchim Champaran, Bihar

Proposed Brick Earth Mining Project at Thana No. 210, Mauza- Gadhhiya,Thana-Chauterwa,Block-Bagaha-1, District-West Champaran, State-Bihar for total mine lease area 1.68 ha or 4.16 acre, Proposed Production-6,060.57 cum/annum or 7,878.74 ton per annum for M/S Payal Int Udyog.

Proposed Brick Earth Mining Project at Thana No. 210, Mauza- Gadhhiya,Thana-Chauterwa,Block-Bagaha-1, District-West Champaran, State-Bihar for total mine lease area 1.68 ha or 4.16 acre, Proposed Production-6,060.57 cum/annum or 7,878.74 ton per annum for M/S Payal Int Udyog is a proposed mining project in Garahia, Bagaha, Pashchim Champaran, Bihar. The site covers 8.2 acres. Its stated project cost is ₹28 lakh. As of 27 Nov 2026, its status is “Initial checks” (since 12 Nov 2026).

See it on the live map All projects in Pashchim Champaran

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Brick Earth Mining Project at Thana No. 210, Mauza- Gadhhiya,Thana-Chauterwa,Block-Bagaha-1, District-West Champaran, State-Bihar for total mine lease area 1.68 ha or 4.16 acre, Proposed Production-6,060.57 cum/annum or 7,878.74 ton per annum for M/S Payal Int Udyog is a proposed mining project in Garahia, Bagaha, Pashchim Champaran, Bihar. The site covers 8.2 acres.

Who is building it?

The applicant is Gajendra Narayan Prasad.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Garahia, Bagaha, Pashchim Champaran, Bihar.

How big is it?

It has a stated cost of ₹28 lakh and a site of 8.2 acres.

When was it filed?

The application was filed on 12 Nov 2026.

Project details

StatusInitial checks
Status since12 Nov 2026
Application filed12 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantGajendra Narayan Prasad
Land area8.2 acres (3.3 ha)
Project cost₹28 lakh
Village / localityGarahia
Taluk / tehsilBagaha
DistrictPashchim Champaran
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-04122

In context

35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 8.2 acres, this one is larger than 71% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Garahia, Bagaha, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.