Quick answers
What is this project?
Proposed Brick Earth Mining Project at Thana-227, Khata No. 2 & Khesra No./Plot no. 2/190,Village- Mauza-Sirauna ,P.S-Chautarwa, Block-Bagaha-1,District-West Champaran, Bihar for a total mine lease area 1.81 ha or 4.48 acre, Proposed Production-5,929.56 m3/annum or 7.708.43TPA , Proposed by M/S Vinay Ent Udyog is a proposed mining project in Sirauna, Bagaha, Pashchim Champaran, Bihar. The site covers 9 acres.
Who is building it?
The applicant is Shubhash Prasad.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Sirauna, Bagaha, Pashchim Champaran, Bihar.
How big is it?
It has a stated cost of ₹38 lakh and a site of 9 acres.
When was it filed?
The application was filed on 13 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 13 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shubhash Prasad |
| Land area | 9 acres (3.6 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Sirauna |
| Taluk / tehsil | Bagaha |
| District | Pashchim Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-04128 |
In context
35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 9 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Sirauna, Bagaha, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project at Thana No. 210, Mauza-… — initial checks, 3.8 km away
- Proposed Brick Earth Mining for M/S Namrata Int Udyog Harpur Soil Brick Mining… — under environmental review, 5 km away
- Mining project by M/s Jaiswal Ent Udhyog at Mauza- Bishambharpur, Block-… — initial checks, 8.4 km away
- Proposed Brick Earth Mining Project for M/S AKG Int Udyog at Mauza- Kotwa,… — environmental approval granted, 11.4 km away
- Proposed Brick clay mining project at Mauja- Tituhiya, Block: Narkatiyaganj,… — environmental approval granted, 12.5 km away
- Proposed Brick clay mining project at Mauja- Baswariya, Block: Lauriya,… — under environmental review, 12.6 km away
- Proposed Sand Mining Project of Area 13.7 Ha at Sand Ghat Unit No.-3 on River… — cleared for impact study, 15.3 km away
- Proposed Brick Earth Mining for M/S Sona Bandhu Int Udyog Serahwa Soil Brick… — under environmental review, 15.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.