Quick answers
What is this project?
Proposed Sand Mining Project of Area 13.7 Ha at Sand Ghat Unit No.-3 on River Gandak, District- West Champaran (Bettiah), State – Bihar is a proposed mining project in Semarbari, Bhitaha, Pashchim Champaran, Bihar. The site covers 33.9 acres.
Who is building it?
The applicant is Chandramohan Ojha.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Apr 2023), as of 27 Nov 2026.
Where is it?
In Semarbari, Bhitaha, Pashchim Champaran, Bihar.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 33.9 acres.
When was it filed?
The application was filed on 6 Apr 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Apr 2023 |
| Application filed | 6 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Chandramohan Ojha |
| Land area | 33.9 acres (13.7 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Semarbari |
| Taluk / tehsil | Bhitaha |
| District | Pashchim Champaran |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00252 |
In context
35 applications in Pashchim Champaran since January 2022 are in the same category (Mining): 17 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 35 days from filing to approval. At 33.9 acres, this one is larger than 91% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Semarbari, Bhitaha, Pashchim Champaran, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earth Mining project of M/s Adyaraj Developers Pvt. Ltd., at Mauza-… — environmental approval granted, 7.9 km away
- Proposed Brick Earth Mining Project at Thana-227, Khata No. 2 & Khesra… — initial checks, 15.3 km away
- Mining project by M/s Jaiswal Ent Udhyog at Mauza- Bishambharpur, Block-… — initial checks, 16.7 km away
- Proposed Brick Earth Mining for M/S Namrata Int Udyog Harpur Soil Brick Mining… — under environmental review, 17.9 km away
- Proposed Brick Earth Mining Project at Thana No. 210, Mauza-… — initial checks, 18.5 km away
- Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on… — environmental approval granted, 18.7 km away
- Proposed Sand Mining Project of Area 29.53 Ha at Gandak River Block- 01on… — cleared for impact study, 18.7 km away
- Proposed Brick Earth Mining Project for M/S AKG Int Udyog at Mauza- Kotwa,… — environmental approval granted, 19.2 km away
More from Chandramohan Ojha in Pashchim Champaran
- Proposed Brick Earth Mining Project for M/S S.K.O ENT Udyog at Mauza-… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.