Quick answers
What is Speciality Chemical Manufacturing Unit?
Speciality Chemical Manufacturing Unit is a proposed industrial project in Bartori, Tilda, Raipur, Chhattisgarh. The site covers 0.3 acres.
Who is building it?
The applicant is Himadri Ghosh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Oct 2024), as of 27 Nov 2026.
Where is it?
In Bartori, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 0.3 acres.
When was it filed?
The application was filed on 4 Mar 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Oct 2024 |
| Application filed | 4 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Himadri Ghosh |
| Land area | 1,100 m² |
| Project cost | ₹1.6 crore |
| Village / locality | Bartori |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02051 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 100% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bartori, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request for Amendment to the Environmental Clearance (Ec) to Permit the… — environmental approval granted, 850 m away
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — environmental approval granted, 850 m away
- Pellet plant of 1x 0.3 MTPA (3,00,000TPA)DRI Kilns (Sponge Iron 1,80,000TPA)… — cleared for impact study, 850 m away
- For proposed "Change in the DRI plant configuration from 2x500 TPD DRI Kilns… — initial checks, 1000 m away
- Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) – 3,30,000 TPA,… — lapsed, 1000 m away
- Proposed Change in the DRI plant configuration from 3 x 100 TPD Kilns to 1 x… — initial checks, 1.2 km away
- Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA),… — environmental approval granted, 1.2 km away
- Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 99,000 TPA),… — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.