Project details
| Official title | Drilling of 23 Nos of 4" Dia Bore Hole for Prospecting in Un-Diverted Forest Land of 921.059 Ha in Mining Lease Over 938.059 Ha of Iron Ore Situated in Village Kalwar Nagur, Tehsil Durgukondal District Kanker of M/S Sail, Bhilai Steel Plant As Per Para 6.1 (2) of Chapter 6 of Consolidated Guideline and Clarification Issued Under Vssa, 1980 and Vssr, 2023. |
|---|---|
| Status | Forest land use approved |
| Status since | 30 Apr 2026 |
| Application filed | 19 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Steel Authority of India LTD |
| Land area | 2,318 acres (938.1 ha) |
| Forest land | 2,276 acres (921.1 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Kalwar |
| Taluk / tehsil | Durgkondal |
| District | Uttar Bastar Kanker |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03894 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalwar, Durgkondal, Uttar Bastar Kanker, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Kalwar-Nagur Iron Ore Mine (20% in first phase from 1.0… — under environmental review, 0 m away
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — forest land use approved, 0 m away
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — lapsed, 0 m away
- Kalwar Iron Ore Block — under environmental review, 1.5 km away
- Kalwar Iron Ore Block — cleared for impact study, 1.5 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — environmental approval granted, 9.6 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — cleared for impact study, 9.6 km away
- Expansion Proposal Of Aridongri Iron Ore Mine By M/s Godawari Power & Ispat… — cleared for impact study, 9.6 km away
More from Steel Authority of India LTD in Uttar Bastar Kanker
- Proposed Expansion of Kalwar-Nagur Iron Ore Mine (20% in first phase from 1.0… — under environmental review
- Drilling of 62 Nos of Exploratory Bore Hole Upto 6" Diameter in Compartment No… — forest land use approved
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — forest land use approved
- Drilling of Additional 39 Nos of Exploratory Bore Hole Upto 6" Diameter for… — lapsed
- Amendment in Ec Dated 04.06.2009 of Rowghat Iron Ore Mine Deposit-F for… — environmental approval granted
- Forest Land Convirsion proposel for Construction of School and Hospital under… — lapsed
8 Steel Authority of India projects in Uttar Bastar Kanker
All 51 Steel Authority of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.