What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raipur, Chhattisgarh

Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnace with matching LRF & CCM (HotBillets / Billets / Ingots – 1,98,000TPA), Rolling Mills (TMT bars / Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with gasifer as fuel – 1,98,000 TPA),Coal Gasifier (1782 Nm3/Hr), Ferro Alloy Unit 2 x 9 MVA (FeSi – 14,000 TPA/FeMn – 40,000 TPA/SiMn – 28,000 TPA/FeCr – 30,000 TPA/ Pig Iron-48,000 TPA), Briquetting Plant (200 Kg/Hr),W

Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnace with matching LRF & CCM (HotBillets / Billets / Ingots – 1,98,000TPA), Rolling Mills (TMT bars / Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with gasifer as fuel – 1,98,000 TPA),Coal Gasifier (1782 Nm3/Hr), Ferro Alloy Unit 2 x 9 MVA (FeSi – 14,000 TPA/FeMn – 40,000 TPA/SiMn – 28,000 TPA/FeCr – 30,000 TPA/ Pig Iron-48,000 TPA), Briquetting Plant (200 Kg/Hr),W is a proposed industrial project in Lakhna, Tilda, Raipur, Chhattisgarh. The site covers 43.4 acres. Its stated project cost is ₹320 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 7 Nov 2023).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnace with matching LRF & CCM (HotBillets / Billets / Ingots – 1,98,000TPA), Rolling Mills (TMT bars / Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with gasifer as fuel – 1,98,000 TPA),Coal Gasifier (1782 Nm3/Hr), Ferro Alloy Unit 2 x 9 MVA (FeSi – 14,000 TPA/FeMn – 40,000 TPA/SiMn – 28,000 TPA/FeCr – 30,000 TPA/ Pig Iron-48,000 TPA), Briquetting Plant (200 Kg/Hr),W is a proposed industrial project in Lakhna, Tilda, Raipur, Chhattisgarh. The site covers 43.4 acres.

Who is building it?

The applicant is Maa Beriwali Steel & Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 7 Nov 2023), as of 27 Nov 2026.

Where is it?

In Lakhna, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹320 crore and a site of 43.4 acres.

When was it filed?

The application was filed on 19 Sept 2023.

Project details

Official titleEstablishment of Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnace with matching LRF & CCM (HotBillets / Billets / Ingots – 1,98,000TPA), Rolling Mills (TMT bars / Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with gasifer as fuel – 1,98,000 TPA),Coal Gasifier (1782 Nm3/Hr), Ferro Alloy Unit 2 x 9 MVA (FeSi – 14,000 TPA/FeMn – 40,000 TPA/SiMn – 28,000 TPA/FeCr – 30,000 TPA/ Pig Iron-48,000 TPA), Briquetting Plant (200 Kg/Hr),W
StatusCleared for impact study
Status since7 Nov 2023
Application filed19 Sept 2023
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantMaa Beriwali Steel & Power Private Limited
Land area43.4 acres (17.6 ha)
Project cost₹320 crore
Village / localityLakhna
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00259

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Oct 2026Under environmental review43.4 acres₹320 crore
Amendment filed 19 Sept 2023 (this page)Cleared for impact study43.4 acres₹320 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 43.4 acres, this one is larger than 63% of them.

Where it is

Lakhna, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.