Quick answers
What is this project?
Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnace with matching LRF & CCM (HotBillets / Billets / Ingots – 1,98,000TPA), Rolling Mills (TMT bars / Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with gasifer as fuel – 1,98,000 TPA),Coal Gasifier (1782 Nm3/Hr), Ferro Alloy Unit 2 x 9 MVA (FeSi – 14,000 TPA/FeMn – 40,000 TPA/SiMn – 28,000 TPA/FeCr – 30,000 TPA/ Pig Iron-48,000 TPA), Briquetting Plant (200 Kg/Hr),W is a proposed industrial project in Lakhna, Tilda, Raipur, Chhattisgarh. The site covers 43.4 acres.
Who is building it?
The applicant is Maa Beriwali Steel & Power Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Nov 2023), as of 27 Nov 2026.
Where is it?
In Lakhna, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹320 crore and a site of 43.4 acres.
When was it filed?
The application was filed on 19 Sept 2023.
Project details
| Official title | Establishment of Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction Furnace with matching LRF & CCM (HotBillets / Billets / Ingots – 1,98,000TPA), Rolling Mills (TMT bars / Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with gasifer as fuel – 1,98,000 TPA),Coal Gasifier (1782 Nm3/Hr), Ferro Alloy Unit 2 x 9 MVA (FeSi – 14,000 TPA/FeMn – 40,000 TPA/SiMn – 28,000 TPA/FeCr – 30,000 TPA/ Pig Iron-48,000 TPA), Briquetting Plant (200 Kg/Hr),W |
|---|---|
| Status | Cleared for impact study |
| Status since | 7 Nov 2023 |
| Application filed | 19 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Maa Beriwali Steel & Power Private Limited |
| Land area | 43.4 acres (17.6 ha) |
| Project cost | ₹320 crore |
| Village / locality | Lakhna |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00259 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Oct 2026 | Under environmental review | 43.4 acres | ₹320 crore |
| Amendment filed 19 Sept 2023 (this page) | Cleared for impact study | 43.4 acres | ₹320 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 43.4 acres, this one is larger than 63% of them.
Where it is
Lakhna, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction… — under environmental review, 0 m away
- Greenfield Steel Plant Comprising of Pellet Plant1x2,000tpd–6,60,000tpa — under environmental review, 7.4 km away
- Proposed project to produce Ferro Alloys (SAF 18 MVA X 4 Nos); FBC based CPP… — environmental approval granted, 7.4 km away
- Proposed project to produce Ferro Alloys (SAF 18 MVA X 4 Nos); FBC based CPP… — cleared for impact study, 7.4 km away
- Proposed project to produce Sponge Iron 165000 TPA, MS Billets 262500 TPA,… — withdrawn, 7.4 km away
- Central Cement Industries — withdrawn, 7.8 km away
- Industrial project by M/S Central Cement Industries — initial checks, 7.8 km away
- Industrial project by M/S Central Cement Industries — environmental approval granted, 7.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.