Quick answers
What is this project?
Proposed project for a DRI based Steel plant to produce Sponge Iron 132,000 TPA; Ferro Alloys ( SiMn 35,000 TPA and/ or, FeMn 44000 TPA and/or FeSi 19000 TPA) and/or Pig iron 70,000 TPA from 9 MVA x 2Nos SAF; Captive Power of 30MW (10 MW through WHRB and 20 MW through AFBC); and Fly Ash Bricks 34,600TPA by M/s. Maa Mansa Iron and Power Pvt. Ltd is a proposed industrial project in Pali, Raigarh, Chhattisgarh. The site covers 98.3 acres.
Who is building it?
The applicant is Maa Mansa Iron and Power Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 May 2023), as of 27 Nov 2026.
Where is it?
In Pali, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹240 crore and a site of 98.3 acres.
When was it filed?
The application was filed on 26 Apr 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project for a DRI based Steel plant to produce Sponge Iron 132,000 TPA; Ferro…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 May 2023 |
| Application filed | 26 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Maa Mansa Iron and Power Private Limited |
| Land area | 98.3 acres (39.8 ha) |
| Project cost | ₹240 crore |
| Village / locality | Pali |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00286 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Aug 2024 | Environmental approval granted | 89.9 acres | ₹240 crore |
| Early planning filed 26 Apr 2023 (this page) | Cleared for impact study | 98.3 acres | ₹240 crore |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 98.3 acres, this one is larger than 57% of them.
Where it is
Pali, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project for a DRI based Steel plant to produce Sponge Iron 132,000… — environmental approval granted, 2.7 km away
- Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge… — environmental approval granted, 6.6 km away
- Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge… — cleared for impact study, 6.6 km away
- Greenfield Steel plant of 2x350TPD&2x200TPD DRI Kilns to produce Sponge-Fe… — returned to applicant, 19.3 km away
- Greenfield Steel plant by M/s Shubh Metallics Private Limited — cleared for impact study, 20 km away
- Greenfield steel plant comprising of DRI Kilns (6,93,000 TPA), Induction… — cleared for impact study, 62.8 km away
- Environmental Clearance for establishment of I/O Beneficiation Plant (1 x 1.7… — withdrawn, 70 km away
- Greenfield steel plant comprising of DRI Kilns 2x350 TPD&2x200 TPD -3,63,000… — environmental approval granted, 89.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.