Quick answers
What is this project?
Greenfield Steel plant of 2x350TPD&2x200TPD DRI Kilns to produce Sponge-Fe 385000TPA IF-3x20Ton&3x15Ton LRF-20Ton with CCM for Hot/M.S Billets 360150TPA RM for Rolled products (TMT bars/Angles/Channels) 349344TPA by hot charging&RHF 10TPH Ferro Alloy plant-2No SAF-9MVA for 36000TPA Si-Mn/19000TPA Fe-Si/45000TPA Fe-Mn/72000TPA Pig-Iron Ductile Fe Pipe 70000TPA&Coal Washery2.52MTPA Power with WHRB 36MW&AFBC 14MW& Fly Ash Brick Plant of 32500 Bricks/Day with Railway siding for transportation is a proposed industrial project in Bhupendrapur, Kharsia, Raigarh, Chhattisgarh. The site covers 222.5 acres.
Who is building it?
The applicant is Shubh Metalics Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Bhupendrapur, Kharsia, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹620 crore and a site of 222.5 acres.
When was it filed?
The application was filed on 3 Feb 2026.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 5 Mar 2026 |
| Application filed | 3 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shubh Metalics Private Limited |
| Land area | 222.5 acres (90 ha) |
| Project cost | ₹620 crore |
| Village / locality | Bhupendrapur |
| Taluk / tehsil | Kharsia |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03065 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 222.5 acres, this one is larger than 75% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhupendrapur, Kharsia, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Steel plant by M/s Shubh Metallics Private Limited — cleared for impact study, 750 m away
- Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge… — environmental approval granted, 13.1 km away
- Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge… — cleared for impact study, 13.1 km away
- Proposed project for a DRI based Steel plant to produce Sponge Iron 132,000… — environmental approval granted, 17.5 km away
- Proposed project for a DRI based Steel plant to produce Sponge Iron 132,000… — cleared for impact study, 19.3 km away
- Greenfield steel plant comprising of DRI Kilns (6,93,000 TPA), Induction… — cleared for impact study, 52.6 km away
- Environmental Clearance for establishment of I/O Beneficiation Plant (1 x 1.7… — withdrawn, 55.1 km away
- Greenfield steel plant comprising of DRI Kilns 2x350 TPD&2x200 TPD -3,63,000… — environmental approval granted, 70.2 km away
More from Shubh Metalics Private Limited in Raigarh
- Greenfield Steel plant by M/s Shubh Metallics Private Limited — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.