What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raigarh, Chhattisgarh

Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge Iron(330000TPA) IF(4x15T) LRF(15T) &RHF(10TPH) with CCM to produce Hot Billets/M.S Billets of 194040TPA RM to Produce Rolled products (TMT bars/Angles/Channels) 186766TPA through hot charging& RHF Coal based PGP 4000Nm3/hr Ferro Alloy plant(2X9MVA SAF) to produce 34000TPA Si-Mn/19000TPA Fe-Si/43000TPA Fe-Mn/68000TPA Pig Iron Power gen. through WHRB#24 MW & FBC#8 MW and Fly Ash Brick Plant of 54900 Bricks/day

Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge Iron(330000TPA) IF(4x15T) LRF(15T) &RHF(10TPH) with CCM to produce Hot Billets/M.S Billets of 194040TPA RM to Produce Rolled products (TMT bars/Angles/Channels) 186766TPA through hot charging& RHF Coal based PGP 4000Nm3/hr Ferro Alloy plant(2X9MVA SAF) to produce 34000TPA Si-Mn/19000TPA Fe-Si/43000TPA Fe-Mn/68000TPA Pig Iron Power gen. through WHRB#24 MW & FBC#8 MW and Fly Ash Brick Plant of 54900 Bricks/day is a proposed industrial project in Barpali, Tamnar, Raigarh, Chhattisgarh. The site covers 123.9 acres. Its stated project cost is ₹445.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Nov 2024).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge Iron(330000TPA) IF(4x15T) LRF(15T) &RHF(10TPH) with CCM to produce Hot Billets/M.S Billets of 194040TPA RM to Produce Rolled products (TMT bars/Angles/Channels) 186766TPA through hot charging& RHF Coal based PGP 4000Nm3/hr Ferro Alloy plant(2X9MVA SAF) to produce 34000TPA Si-Mn/19000TPA Fe-Si/43000TPA Fe-Mn/68000TPA Pig Iron Power gen. through WHRB#24 MW & FBC#8 MW and Fly Ash Brick Plant of 54900 Bricks/day is a proposed industrial project in Barpali, Tamnar, Raigarh, Chhattisgarh. The site covers 123.9 acres.

Who is building it?

The applicant is Kelo Steel & Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 Nov 2024), as of 27 Nov 2026.

Where is it?

In Barpali, Tamnar, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹445.1 crore and a site of 123.9 acres.

When was it filed?

The application was filed on 26 Aug 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge Iron(330000TPA)…

Project details

Official titleEstablishment of proposed Steel plant consisting of 4x250TPD DRI Kilns to produce Sponge Iron(330000TPA) IF(4x15T) LRF(15T) &RHF(10TPH) with CCM to produce Hot Billets/M.S Billets of 194040TPA RM to Produce Rolled products (TMT bars/Angles/Channels) 186766TPA through hot charging& RHF Coal based PGP 4000Nm3/hr Ferro Alloy plant(2X9MVA SAF) to produce 34000TPA Si-Mn/19000TPA Fe-Si/43000TPA Fe-Mn/68000TPA Pig Iron Power gen. through WHRB#24 MW & FBC#8 MW and Fly Ash Brick Plant of 54900 Bricks/day
StatusCleared for impact study
Status since29 Nov 2024
Application filed26 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKelo Steel & Power Private Limited
Land area123.9 acres (50.2 ha)
Project cost₹445.1 crore
Village / localityBarpali
Taluk / tehsilTamnar
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00950

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Oct 2025Environmental approval granted123.9 acres₹445.1 crore
Early planning filed 26 Aug 2024 (this page)Cleared for impact study123.9 acres₹445.1 crore

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 123.9 acres, this one is larger than 63% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barpali, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.