Quick answers
What is this project?
Transfer of TOR letter for Establishment of 1 x 9 MVA Ferro Alloys plant (Silicon Manganese – 14400 TPA OR Ferro Manganese – 25200 TPA OR Ferro Chrome – 15000 TPA OR Ferro Silicon – 7000 TPA OR Pig Iron – 25200 TPA) in existing 7.5 MW Biomass based Power Plant premises (Forward Integration) in existing plant premises at Khamhardih (V), Pathariya (T), Mungeli (D), Chhattisgarh from M/s. Real Power Private Ltd. to M/s. Seeta Energen Pvt. Ltd is a lapsed industrial project in Khamhard\H, Pathariya, Mungeli, Chhattisgarh. The site covers 26.8 acres.
Who is building it?
The applicant is Seeta Energen Private Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Khamhard\H, Pathariya, Mungeli, Chhattisgarh.
How big is it?
It has a stated cost of ₹13 crore and a site of 26.8 acres.
When was it filed?
The application was filed on 19 Jun 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 19 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Seeta Energen Private Limited |
| Land area | 26.8 acres (10.9 ha) |
| Project cost | ₹13 crore |
| Village / locality | Khamhard\H |
| Taluk / tehsil | Pathariya |
| District | Mungeli |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00339 |
In context
16 applications in Mungeli since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 26.8 acres, this one is smaller than 75% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khamhard\H, Pathariya, Mungeli, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance (EC) from Real Power Private Limited to… — environmental approval granted, 0 m away
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — initial checks, 0 m away
- Change in configuration of the plant under provision of NIPL as per the EIA… — initial checks, 0 m away
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — environmental approval granted, 0 m away
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — cleared for impact study, 0 m away
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — lapsed, 500 m away
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — withdrawn, 500 m away
- Transfer of Environmental Clearance (EC) from M/s Basudev Trade Link to M/s… — environmental approval granted, 500 m away
More from Seeta Energen Private Limited in Mungeli
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — initial checks
- Change in configuration of the plant under provision of NIPL as per the EIA… — initial checks
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — environmental approval granted
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — cleared for impact study
- Transfer of Environmental Clearance (EC) from Real Power Private Limited to… — environmental approval granted
All 6 Seeta Energen projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.