Quick answers
What is this project?
Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA, Induction Furnace with CCM (Ingot/Billet) 60,000 TPA to 1,50,000 TPA,Hot Charged Rolling Mill (Rolled products) 1,45,500 TPA with 85 % Hot charging & 15% through RHF; WHRB from 5 to 15 MW; CFBC Based Power Plant –18 MW (1x8,1x10 MW)Coal Gasifier (Producer Gas ) 6,000 Nm3/hr; new SAF 1x9MVA (FeSi-7,000 OR / FeMn-25,200 OR / SiMn-14,400 OR / Pig Iron-25,200 TPA), Briquetting plant 200kg/hr ,fly ash bricks 95000 bricks/day is a lapsed industrial project in Rambod, Pathariya, Mungeli, Chhattisgarh. The site covers 30.1 acres.
Who is building it?
The applicant is Basudev Green Steel and Power Limited.
Has it been approved?
No. The application was lapsed on 15 Nov 2026, so it is no longer under consideration.
Where is it?
In Rambod, Pathariya, Mungeli, Chhattisgarh.
How big is it?
It has a stated cost of ₹291 crore and a site of 30.1 acres.
When was it filed?
The application was filed on 11 Oct 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Nov 2026 |
| Application filed | 11 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Basudev Green Steel and Power Limited |
| Land area | 30.1 acres (12.2 ha) |
| Project cost | ₹291 crore |
| Village / locality | Rambod |
| Taluk / tehsil | Pathariya |
| District | Mungeli |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03279 |
In context
16 applications in Mungeli since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30.1 acres, this one is smaller than 56% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rambod, Pathariya, Mungeli, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — withdrawn, 0 m away
- Transfer of Environmental Clearance (EC) from M/s Basudev Trade Link to M/s… — environmental approval granted, 0 m away
- Transfer of Environmental Clearance from M/s Radha Madhav Industries Private… — lapsed, 0 m away
- Basudev Trade Link — initial checks, 50 m away
- Transfer of Environmental Clearance (EC) from Real Power Private Limited to… — environmental approval granted, 500 m away
- Transfer of TOR letter for Establishment of 1 x 9 MVA Ferro Alloys plant… — lapsed, 500 m away
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — initial checks, 500 m away
- Change in configuration of the plant under provision of NIPL as per the EIA… — initial checks, 500 m away
More from Basudev Green Steel and Power Limited in Mungeli
- Transfer of Environmental Clearance (EC) from M/s Basudev Trade Link to M/s… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.