WithdrawnIndustry · Mungeli, Chhattisgarh

Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA, Induction Furnace with CCM (Ingot/Billet) 60,000 TPA to 1,05,000 TPA,Hot Charged Rolling Mill (Rolled products) 1,02,000 TPA with 85 % Hot charging and remaining 15% through RHF; WHRB from 5 to 15 MW; CFBC Based Power Plant –8 MW to 18 MW, Coal Gasifier (Producer Gas ) 6,000 Nm3/hr; new Submerged Electric Arc Furnace - 1 x 9 MVA (FeSi-7,000 / FeMn-25,200 / SiMn-14,400 / Pig Iron-25,200 TPA), Briquetting plant 200 kg/hr

Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA, Induction Furnace with CCM (Ingot/Billet) 60,000 TPA to 1,05,000 TPA,Hot Charged Rolling Mill (Rolled products) 1,02,000 TPA with 85 % Hot charging and remaining 15% through RHF; WHRB from 5 to 15 MW; CFBC Based Power Plant –8 MW to 18 MW, Coal Gasifier (Producer Gas ) 6,000 Nm3/hr; new Submerged Electric Arc Furnace - 1 x 9 MVA (FeSi-7,000 / FeMn-25,200 / SiMn-14,400 / Pig Iron-25,200 TPA), Briquetting plant 200 kg/hr is a withdrawn industrial project in Rambor, Pathariya, Mungeli, Chhattisgarh. The site covers 30.1 acres. Its stated project cost is ₹291 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 11 Oct 2026).

See it on the live map All projects in Mungeli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA, Induction Furnace with CCM (Ingot/Billet) 60,000 TPA to 1,05,000 TPA,Hot Charged Rolling Mill (Rolled products) 1,02,000 TPA with 85 % Hot charging and remaining 15% through RHF; WHRB from 5 to 15 MW; CFBC Based Power Plant –8 MW to 18 MW, Coal Gasifier (Producer Gas ) 6,000 Nm3/hr; new Submerged Electric Arc Furnace - 1 x 9 MVA (FeSi-7,000 / FeMn-25,200 / SiMn-14,400 / Pig Iron-25,200 TPA), Briquetting plant 200 kg/hr is a withdrawn industrial project in Rambor, Pathariya, Mungeli, Chhattisgarh. The site covers 30.1 acres.

Who is building it?

The applicant is Basudev Trade Link.

Has it been approved?

No. The application was withdrawn on 11 Oct 2026, so it is no longer under consideration.

Where is it?

In Rambor, Pathariya, Mungeli, Chhattisgarh.

How big is it?

It has a stated cost of ₹291 crore and a site of 30.1 acres.

When was it filed?

The application was filed on 11 Oct 2026.

Project details

StatusWithdrawn
Status since11 Oct 2026
Application filed11 Oct 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBasudev Trade Link
Land area30.1 acres (12.2 ha)
Project cost₹291 crore
Village / localityRambor
Taluk / tehsilPathariya
DistrictMungeli
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03735

In context

16 applications in Mungeli since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30.1 acres, this one is smaller than 56% of them.

31 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rambor, Pathariya, Mungeli, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Basudev Trade Link in Mungeli

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.