Quick answers
What is this project?
Expansion of existing plant through establishment of DRI Kilns (Sponge Iron 4,29,000 TPA), Induction Furnace with LRF & CCM (Billets / Ingots) (3,96,000 TPA), WHRB based Power Plant -2 x 15 MW, CFBC based Power Plant– 1 x 10 MW, Fly Ash Bricks -346 TPD in the existing 7.5 MW Biomass based Power Plant and 1x9 MVA Ferro Alloys plant (Si-Mn 14,400 TPA or Fe-Mn 25,200 TPA or Ferro Chrome 15,000 TPA or Fe-Si 7,000 TPA or Pig Iron 25,200 TPA) at Vill -Khamhardih,Tehsil- Pathariya,District-Mungeli, C.G is a proposed industrial project in Rambor, Pathariya, Mungeli, Chhattisgarh. The site covers 86.7 acres.
Who is building it?
The applicant is Seeta Energen Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 May 2024), as of 27 Nov 2026.
Where is it?
In Rambor, Pathariya, Mungeli, Chhattisgarh.
How big is it?
It has a stated cost of ₹543 crore and a site of 86.7 acres.
When was it filed?
The application was filed on 6 May 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing plant through establishment of DRI Kilns (Sponge Iron 4,29,000…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 May 2024 |
| Application filed | 6 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Seeta Energen Private Limited |
| Land area | 86.7 acres (35.1 ha) |
| Project cost | ₹543 crore |
| Village / locality | Rambor |
| Taluk / tehsil | Pathariya |
| District | Mungeli |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01431 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Oct 2026 | Initial checks | 86.7 acres | ₹543 crore |
| Expansion filed 27 Mar 2025 | Environmental approval granted | 86.7 acres | ₹543 crore |
| Early planning filed 6 May 2024 (this page) | Cleared for impact study | 86.7 acres | ₹543 crore |
In context
16 applications in Mungeli since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 86.7 acres, this one is larger than 75% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rambor, Pathariya, Mungeli, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — initial checks, 0 m away
- Change in configuration of the plant under provision of NIPL as per the EIA… — initial checks, 0 m away
- Expansion of existing plant through establishment of DRI Kilns (Sponge Iron… — environmental approval granted, 0 m away
- Transfer of Environmental Clearance (EC) from Real Power Private Limited to… — environmental approval granted, 0 m away
- Transfer of TOR letter for Establishment of 1 x 9 MVA Ferro Alloys plant… — lapsed, 0 m away
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — lapsed, 500 m away
- Expansion of Existing Sponge Iron Plant from 58,500 TPA to 1,74,000 TPA,… — withdrawn, 500 m away
- Transfer of Environmental Clearance (EC) from M/s Basudev Trade Link to M/s… — environmental approval granted, 500 m away
More from Seeta Energen Private Limited in Mungeli
- Change in configuration of the plant under provision of NIPL as per the EIA… — initial checks
- Transfer of Environmental Clearance (EC) from Real Power Private Limited to… — environmental approval granted
- Transfer of TOR letter for Establishment of 1 x 9 MVA Ferro Alloys plant… — lapsed
All 6 Seeta Energen projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.