Quick answers
What is Industrial project by Jai Ambe Ispat Pvt. Ltd.?
This proposed industrial project by Jai Ambe Ispat Pvt. Ltd. is in Sarora, Raipur, Chhattisgarh. The site covers 16.7 acres.
Who is building it?
The applicant is Jaiambe Ispat Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Sarora, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹4.4 crore and a site of 16.7 acres.
When was it filed?
The application was filed on 21 May 2023.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 21 May 2023 |
| Application filed | 21 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jaiambe Ispat Private Limited |
| Land area | 16.7 acres (6.8 ha) |
| Project cost | ₹4.4 crore |
| Village / locality | Sarora |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00340 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16.7 acres, this one is smaller than 56% of them.
81 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarora, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jai Ambe Ispat Pvt. Ltd. (Unit - II) — lapsed, 200 m away
- Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance… — cleared for impact study, 850 m away
- Regularization of Re-Rolling Mill plant of 30000 MTPA capacity, in compliance… — cleared for impact study, 1.1 km away
- Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance… — cleared for impact study, 1.2 km away
- Industrial project by B K Rolling Mill Pvt. Ltd. — cleared for impact study, 1.2 km away
- Regularization cum expansion of existing steel plant - Steel re-rolling mills… — cleared for impact study, 1.3 km away
- Regularization of the existing manufacturing of Re-Rolled Products having… — cleared for impact study, 1.3 km away
- Goyal Energy and Steel PVT. LTD. Unit-4 — cleared for impact study, 1.3 km away