What is this project?
Regularization cum expansion of existing steel plant - Steel re-rolling mills (Re-Rolled Product) (Existing-30,000 Metric Ton Per Year); New Induction Furnaces (4 x 12 T ) with LRF +CCM (MS Ingots/ billets) -1,54,000 TPA; Rolling mill Hot charging -1,20,000 TPA at Khasra No 344/1,344/6,344/7,344/11, village Bhorjhara, Tahsil-Dharsiwa,Dist -Raipur, CG is a proposed industrial project in Borjhara, Raipur, Chhattisgarh. The site covers 9 acres.
Who is building it?
The applicant is Rama Power and Steel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Sept 2023), as of 27 Nov 2026.
Where is it?
In Borjhara, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹103.5 crore and a site of 9 acres.
When was it filed?
The application was filed on 6 Sept 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Sept 2023 |
| Application filed | 6 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rama Power and Steel Private Limited |
| Land area | 9 acres (3.7 ha) |
| Project cost | ₹103.5 crore |
| Village / locality | Borjhara |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-00489 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9 acres, this one is smaller than 61% of them.
80 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borjhara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Goyal Energy and Steel PVT. LTD. Unit-4 — cleared for impact study, 100 m away
- Regularization of the existing manufacturing of Re-Rolled Products having… — cleared for impact study, 100 m away
- Industrial project by Aayum Engineering Private Limited — lapsed, 700 m away
- Expansion of Shri Laxmi Narayan Real Ispat Private Limited — cleared for impact study, 900 m away
- Industrial project by B K Rolling Mill Pvt. Ltd. — cleared for impact study, 950 m away
- Jai Ambe Ispat Pvt. Ltd. (Unit - II) — lapsed, 1.2 km away
- Proposed implementation of Induction Furnace, CCM to produce MS Billet… — lapsed, 1.2 km away
- Industrial project by Jai Ambe Ispat Pvt. Ltd. — under environmental review, 1.3 km away