Quick answers
What is this project?
Regularization of the existing manufacturing of Re-Rolled Products having capacity of 30,000 Metric TPA located at Khasra No 324/02, Village - Borjhara, District- Raipur (C.G.) by GOYAL ENERGY AND STEEL PVT. LTD. UNIT 5 is a proposed industrial project in Borjhara, Raipur, Chhattisgarh. The site covers 4 acres.
Who is building it?
The applicant is Goyal Energy and Steel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Jul 2023), as of 27 Nov 2026.
Where is it?
In Borjhara, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 4 acres.
When was it filed?
The application was filed on 11 Jul 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Jul 2023 |
| Application filed | 11 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Goyal Energy and Steel Private Limited |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Borjhara |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-00406 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 78% of them.
77 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borjhara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Goyal Energy and Steel PVT. LTD. Unit-4 — cleared for impact study, 0 m away
- Regularization cum expansion of existing steel plant - Steel re-rolling mills… — cleared for impact study, 100 m away
- Industrial project by Aayum Engineering Private Limited — lapsed, 600 m away
- Expansion of Shri Laxmi Narayan Real Ispat Private Limited — cleared for impact study, 800 m away
- Industrial project by B K Rolling Mill Pvt. Ltd. — cleared for impact study, 900 m away
- Jai Ambe Ispat Pvt. Ltd. (Unit - II) — lapsed, 1.2 km away
- Proposed implementation of Induction Furnace, CCM to produce MS Billet… — lapsed, 1.3 km away
- Industrial project by Jai Ambe Ispat Pvt. Ltd. — under environmental review, 1.3 km away
More from Goyal Energy and Steel Private Limited in Raipur
- Goyal Energy and Steel PVT. LTD. Unit-4 — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.