Quick answers
What is this project?
Regularization of Re-Rolling Mill plant of 17700 MTPA capacity, in compliance to the MoEF&CC Notification dated 20th July 2022 at Khasra No. 282/6 , 282/7, 282/8, 282/3, 282/4, 282/5, 284/7, 284/6, 282/1, 284/5, 297/2 AND 284/4, village – URLA, Dist - Raipur, Chhattisgarh by M/s Century Steel and Power LLP is a proposed industrial project in Urla, Raipur, Chhattisgarh. The site covers 6 acres.
Who is building it?
The applicant is Century Steel & Power LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Urla, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹2 crore and a site of 6 acres.
When was it filed?
The application was filed on 13 May 2023.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 May 2023 |
| Application filed | 13 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Century Steel & Power LLP |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Urla |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00493 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is smaller than 71% of them.
77 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Urla, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hanumant Rerollers — cleared for impact study, 350 m away
- Regularization of the existing manufacturing of Re-Rolled Products having… — more information requested, 1.3 km away
- Expansion of Shri Laxmi Narayan Real Ispat Private Limited — cleared for impact study, 1.4 km away
- Industrial project by B K Rolling Mill Pvt. Ltd. — cleared for impact study, 1.4 km away
- Industrial project by Hare Krishna Steel Pipes Pvt. Ltd. — cleared for impact study, 1.5 km away
- Industrial project by Shri Giriraj Loha Private Limited — cleared for impact study, 1.5 km away
- Industrial project by Aayum Engineering Private Limited — lapsed, 1.6 km away
- For proposed "increase in production capacity of existing Hot Charging Rolling… — initial checks, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.