Expansion of Shri Laxmi Narayan Real Ispat Private Limited is a proposed industrial project in Borjhara, Raipur, Chhattisgarh. The site covers 4.3 acres.
Who is building it?
The applicant is Khimji Patel.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Jun 2024), as of 27 Nov 2026.
Where is it?
In Borjhara, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹18.2 crore and a site of 4.3 acres.
When was it filed?
The application was filed on 25 Jun 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Jun 2024 |
| Application filed | 25 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Khimji Patel |
| Land area | 4.3 acres (1.8 ha) |
| Project cost | ₹18.2 crore |
| Village / locality | Borjhara |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00051 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.3 acres, this one is smaller than 76% of them.
75 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borjhara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Aayum Engineering Private Limited — lapsed, 250 m away
- Regularization of the existing manufacturing of Re-Rolled Products having… — cleared for impact study, 800 m away
- Industrial project by B K Rolling Mill Pvt. Ltd. — cleared for impact study, 800 m away
- Goyal Energy and Steel PVT. LTD. Unit-4 — cleared for impact study, 800 m away
- Regularization cum expansion of existing steel plant - Steel re-rolling mills… — cleared for impact study, 900 m away
- Hanumant Rerollers — cleared for impact study, 1.2 km away
- For proposed "increase in production capacity of existing Hot Charging Rolling… — initial checks, 1.3 km away
- Regularization of Re-Rolling Mill plant of 17700 MTPA capacity, in compliance… — under environmental review, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.