Quick answers
What is this project?
For proposed "increase in production capacity of existing Hot Charging Rolling Mill Capacity from 2,40,000 TPA to 3,88,350 TPA. without increase in the Pollution Load in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed industrial project in Borjhara, Raipur, Chhattisgarh. The site covers 75.7 acres.
Who is building it?
The applicant is Real Ispat and Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Borjhara, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹47.5 crore and a site of 75.7 acres.
When was it filed?
The application was filed on 13 Nov 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 13 Nov 2024 |
| Application filed | 13 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Real Ispat and Power Limited |
| Land area | 75.7 acres (30.7 ha) |
| Project cost | ₹47.5 crore |
| Village / locality | Borjhara |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02102 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 75.7 acres, this one is larger than 80% of them.
70 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borjhara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Shri Laxmi Narayan Real Ispat Private Limited — cleared for impact study, 1.3 km away
- Industrial project by Aayum Engineering Private Limited — lapsed, 1.4 km away
- Hanumant Rerollers — cleared for impact study, 1.5 km away
- Regularization of Re-Rolling Mill plant of 17700 MTPA capacity, in compliance… — under environmental review, 1.8 km away
- Proposed implementation of Induction Furnace, CCM to produce MS Billet… — lapsed, 1.9 km away
- Regularization of the existing manufacturing of Re-Rolled Products having… — cleared for impact study, 1.9 km away
- Goyal Energy and Steel PVT. LTD. Unit-4 — cleared for impact study, 1.9 km away
- Regularization cum expansion of existing steel plant - Steel re-rolling mills… — cleared for impact study, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.