Quick answers
What is Industrial project by Hare Krishna Steel Pipes Pvt. Ltd.?
This proposed industrial project by Hare Krishna Steel Pipes Pvt. Ltd. is in Bendri, Raipur, Chhattisgarh. The site covers 8.7 acres.
Who is building it?
The applicant is Harekrishna Steel Pipes Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 May 2023), as of 27 Nov 2026.
Where is it?
In Bendri, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹4.7 crore and a site of 8.7 acres.
When was it filed?
The application was filed on 19 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 May 2023 |
| Application filed | 19 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Harekrishna Steel Pipes Private Limited |
| Land area | 8.7 acres (3.5 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Bendri |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00518 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.7 acres, this one is smaller than 61% of them.
69 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bendri, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hanumant Rerollers — cleared for impact study, 1.4 km away
- Regularization of Re-Rolling Mill plant of 17700 MTPA capacity, in compliance… — under environmental review, 1.5 km away
- Regularisation of Rerolling Mill operating with Consent under Air Act and… — lapsed, 1.9 km away
- Industrial project by Yashoda Nandan Ispat PVT LTD — environmental approval granted, 2 km away
- For proposed "increase in production capacity of existing Hot Charging Rolling… — initial checks, 2 km away
- Expansion of Shri Laxmi Narayan Real Ispat Private Limited — cleared for impact study, 2.5 km away
- Expansion of Ferro Alloys Manufacturing Unit : Silico Manganese (SiMn) –… — under environmental review, 2.6 km away
- Expansion of Ferro Alloys Production Unit — environmental approval granted, 2.6 km away