Quick answers
What is this project?
Proposed implementation of Induction Furnace, CCM to produce MS Billet 2,90,400 TPA as intermediate product is a lapsed industrial project in Guma, Raipur, Chhattisgarh. The site covers 12.2 acres.
Who is building it?
The applicant is Panna Bansal.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Guma, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹76 crore and a site of 12.2 acres.
When was it filed?
The application was filed on 9 Feb 2024.
Project details
| Official title | Proposed implementation of Induction Furnace, CCM to produce MS Billet 2,90,400 TPA as intermediate product along with Hot Charging based Rolling Mill to produce 2,83,140 TPA Rolled Steel Product & expansion in permitted capacity of Fabricated Pipe/profile of steel from 2,40,000 TPA to 2,50,000 TPA at Village - Guma, Block - Dharsiwa, Tehsil & District - Raipur (CG) by M/s. PLB Dhankuber Agro Industries [Consultant: M/s. Anacon Laboratories Pvt. Ltd.; accreditation No. NABET/EIA/2326/RA 0304] |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 9 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Panna Bansal |
| Land area | 12.2 acres (4.9 ha) |
| Project cost | ₹76 crore |
| Village / locality | Guma |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-00519 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.2 acres, this one is smaller than 59% of them.
67 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Guma, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Production Capacity Based on No Increased in Pollution Load… — initial checks, 250 m away
- Surrender of EC as Standalone Rerolling Mill are exempted from EC as per MOECC… — not approved, 250 m away
- Industrial project by Shri Niwasa Maruti Steels Pvt. Ltd. — under environmental review, 600 m away
- Regularization cum expansion of existing steel plant - Steel re-rolling mills… — cleared for impact study, 1.2 km away
- Goyal Energy and Steel PVT. LTD. Unit-4 — cleared for impact study, 1.3 km away
- Regularization of the existing manufacturing of Re-Rolled Products having… — cleared for impact study, 1.3 km away
- Industrial project by Aayum Engineering Private Limited — lapsed, 1.3 km away
- Expansion of Shri Laxmi Narayan Real Ispat Private Limited — cleared for impact study, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.