Quick answers
What is Biladi Low Grade Limestone Quarry?
Biladi Low Grade Limestone Quarry is an approved mining project in Khapri Kalan, Tilda, Raipur, Chhattisgarh. The site covers 7.2 acres.
Who is building it?
The applicant is Shri Balaji Stone Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Apr 2026), as of 27 Nov 2026.
Where is it?
In Khapri Kalan, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹24 lakh and a site of 7.2 acres.
When was it filed?
The application was filed on 14 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Apr 2026 |
| Application filed | 14 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Shri Balaji Stone Industries |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹24 lakh |
| Village / locality | Khapri Kalan |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02526 |
In context
273 applications in Raipur since January 2022 are in the same category (Mining): 123 approved, 21 filed or under review, and 129 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 7.2 acres, this one is larger than 69% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khapri Kalan, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nikunj Patel — lapsed, 0 m away
- Biladi Limestone Quarry — withdrawn, 0 m away
- Explosive Storage at Tilda, Raipur District of Chhattisgarh State — in-principle approval, conditions pending, 1.3 km away
- Greenfield Project of 60 KLPD Grain Based Ethanol Plant by Shri. Sanjay Gupta… — environmental approval granted, 2.1 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — environmental approval granted, 2.9 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — cleared for impact study, 2.9 km away
- Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces,… — environmental approval granted, 2.9 km away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 2.9 km away
More from Shri Balaji Stone Industries in Raipur
- Nikunj Patel — lapsed
- Biladi Limestone Quarry — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.