What is this project?
Amendment in EC of 4X600 MW Thermal Power Plant of M/s Jindal Power Ltd is an approved power project in Manjhapara, Tamnar, Raigarh, Chhattisgarh. The site covers 889.6 acres.
Who is building it?
The applicant is Jindal Power Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Jun 2026), as of 27 Nov 2026.
Where is it?
In Manjhapara, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹11,333 crore and a site of 889.6 acres.
When was it filed?
The application was filed on 14 Jun 2024.
Project details
| Official title | Amendment in EC of 4X600 MW Thermal Power Plant of M/s Jindal Power Ltd. at Village Tamnar, Taluk Gharghoda, District Raigarh (Chhattisgarh) |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Jun 2026 |
| Application filed | 14 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Jindal Power Limited |
| Land area | 889.6 acres (360 ha) |
| Project cost | ₹11,333 crore |
| Village / locality | Manjhapara |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00880 |
In context
29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 889.6 acres, this one is larger than 64% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Manjhapara, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power… — returned to applicant, 4.1 km away
- Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power… — under environmental review, 4.3 km away
- PROPOSED 4x660 (2640) MW COAL BASED SUPER CRITICAL THERMAL POWER PLANT — withdrawn, 5.1 km away
- Gare Palma Sector-II Coal Mine Project of 23.60 MTPA (OC-22.0 MTPA + UG- 1.6… — environmental approval granted, 5.2 km away
- Diversion of 119.277 ha. Forest land in Gare Palma Sector-I Coal Mine (Block… — under forest review, 6.4 km away
- Gare pelma Sector-I Coal Mine — lapsed, 6.4 km away
- Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00… — under environmental review, 6.5 km away
- Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00… — cleared for impact study, 6.5 km away
More from Jindal Power Limited in Raigarh
- Banai & Bhalumunda Opencast Coal Mine project of M/s Jindal Power Limited… — under environmental review
- Banai & Bhalumuda Opencast Coal Mine project of M/s Jindal Power Limited… — under forest review
- Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power… — under environmental review
- Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00… — under environmental review
- Banai & Bhalumuda Opencast Coal Mine project of M/s Jindal Power Limited… — more information requested
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — under forest review
23 Jindal Power projects in Raigarh
All 27 Jindal Power projects across India