What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raipur, Chhattisgarh

Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30

Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30 is a proposed industrial project in Alda, Tilda, Raipur, Chhattisgarh. The site covers 238.5 acres. Its stated project cost is ₹485 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Jun 2024).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30 is a proposed industrial project in Alda, Tilda, Raipur, Chhattisgarh. The site covers 238.5 acres.

Who is building it?

The applicant is Balajee Sponge and Power Pvt.Ltd..

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Jun 2024), as of 27 Nov 2026.

Where is it?

In Alda, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹485 crore and a site of 238.5 acres.

When was it filed?

The application was filed on 3 Jun 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace…

Project details

Official titleEstablishment of Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30,
StatusCleared for impact study
Status since13 Jun 2024
Application filed3 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBalajee Sponge and Power Pvt.Ltd.
Land area238.5 acres (96.5 ha)
Project cost₹485 crore
Village / localityAlda
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01132

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 31 Oct 2025Environmental approval granted313.1 acres₹485 crore
Early planning filed 3 Jun 2024 (this page)Cleared for impact study238.5 acres₹485 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 238.5 acres, this one is larger than 93% of them.

Where it is

Alda, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.