Quick answers
What is this project?
Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30 is a proposed industrial project in Alda, Tilda, Raipur, Chhattisgarh. The site covers 238.5 acres.
Who is building it?
The applicant is Balajee Sponge and Power Pvt.Ltd..
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Jun 2024), as of 27 Nov 2026.
Where is it?
In Alda, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹485 crore and a site of 238.5 acres.
When was it filed?
The application was filed on 3 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace…
Project details
| Official title | Establishment of Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30, |
|---|---|
| Status | Cleared for impact study |
| Status since | 13 Jun 2024 |
| Application filed | 3 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Balajee Sponge and Power Pvt.Ltd. |
| Land area | 238.5 acres (96.5 ha) |
| Project cost | ₹485 crore |
| Village / locality | Alda |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01132 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Oct 2025 | Environmental approval granted | 313.1 acres | ₹485 crore |
| Early planning filed 3 Jun 2024 (this page) | Cleared for impact study | 238.5 acres | ₹485 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 238.5 acres, this one is larger than 93% of them.
Where it is
Alda, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA),… — environmental approval granted, 5.4 km away
- Explosive Storage at Tilda, Raipur District of Chhattisgarh State — in-principle approval, conditions pending, 12.4 km away
- Greenfield Steel plant by M/s Shri Ram Navin Kumar & Sons Ispat Private Limited — under environmental review, 12.7 km away
- Change in the Name of Company, No Change in Ownership , No Transfer of Ec… — environmental approval granted, 12.9 km away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 12.9 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — environmental approval granted, 13 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — cleared for impact study, 13 km away
- Proposed project to produce Ferro Alloys (SAF 18 MVA X 4 Nos); FBC based CPP… — environmental approval granted, 13.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.