Quick answers
What is this project?
Explosive Storage at Tilda, Raipur District of Chhattisgarh State is a proposed project in Biladi, Tilda, Raipur, Chhattisgarh. The site covers 9.9 acres.
Who is building it?
The applicant is Gulf Oil Corporation Limited Bilaspur.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Biladi, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹90 lakh; a site of 9.9 acres and 9.9 acres (4 ha) of forest land.
When was it filed?
The application was filed on 9 Apr 2025.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 6 Oct 2026 |
| Application filed | 9 Apr 2025 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Other |
| Applicant | Gulf Oil Corporation Limited Bilaspur |
| Land area | 9.9 acres (4 ha) |
| Forest land | 9.9 acres (4 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Biladi |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03948 |
In context
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Biladi, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Biladi Limestone Quarry — withdrawn, 1.3 km away
- Biladi Low Grade Limestone Quarry — environmental approval granted, 1.3 km away
- Nikunj Patel — lapsed, 1.3 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — environmental approval granted, 2 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — cleared for impact study, 2 km away
- Greenfield Project of 60 KLPD Grain Based Ethanol Plant by Shri. Sanjay Gupta… — environmental approval granted, 3.4 km away
- Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces,… — environmental approval granted, 4.1 km away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.