Quick answers
What is this project?
Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30 is an approved industrial project in Alda, Tilda, Raipur, Chhattisgarh. The site covers 313.1 acres.
Who is building it?
The applicant is Balajee Sponge and Power Pvt.Ltd..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Alda, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹485 crore and a site of 313.1 acres.
When was it filed?
The application was filed on 31 Oct 2025.
Project details
| Official title | Establishment of Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 5,28,000 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strip) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 4,95,000 TPA), Gasifier for Reheating Furnace – (3 x 1500 NM3/Hr), Ferro Alloy Unit 2 x 9 MVA ( FeSi – 14,000 TPA / FeMn – 40,000 TPA / SiMn – 28,000 TPA / FeCr - 30, |
|---|---|
| Status | Environmental approval granted |
| Status since | 29 Apr 2026 |
| Application filed | 31 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Balajee Sponge and Power Pvt.Ltd. |
| Land area | 313.1 acres (126.7 ha) |
| Project cost | ₹485 crore |
| Village / locality | Alda |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02378 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Oct 2025 (this page) | Environmental approval granted | 313.1 acres | ₹485 crore |
| Early planning filed 3 Jun 2024 | Cleared for impact study | 238.5 acres | ₹485 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 313.1 acres, this one is larger than 97% of them.
Where it is
Alda, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Steel comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA),… — cleared for impact study, 5.4 km away
- Explosive Storage at Tilda, Raipur District of Chhattisgarh State — in-principle approval, conditions pending, 7.8 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — environmental approval granted, 8 km away
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — cleared for impact study, 8 km away
- Biladi Low Grade Limestone Quarry — environmental approval granted, 8.9 km away
- Nikunj Patel — lapsed, 8.9 km away
- Biladi Limestone Quarry — withdrawn, 8.9 km away
- Change in the Name of Company, No Change in Ownership , No Transfer of Ec… — environmental approval granted, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.