Quick answers
What is this project?
Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) – 3,30,000 TPA, WHRB based Power Plant – 2 x 10 MW, FBC based Power Plant –2 x 10 MW, Ferro Alloys Unit (2 x 9 MVA)FeSi – 14,000 TPA/ FeMn – 25,200 TPA/ SiMn – 28,800 TPA/FeCr –30,000 TPA,Pig Iron – 50,400 TPA), Briquetting Plant (200 Kg/Hr.)& Brick Manufacturing unit (30,000 Bricks / Day) in Phased Manner is an approved industrial project in Bahesar, Tilda, Raipur, Chhattisgarh. The site covers 153.4 acres.
Who is building it?
The applicant is Shaurya Ispat Udyog Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 May 2024), as of 27 Nov 2026.
Where is it?
In Bahesar, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹400 crore and a site of 153.4 acres.
When was it filed?
The application was filed on 2 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 May 2024 |
| Application filed | 2 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shaurya Ispat Udyog Private Limited |
| Land area | 153.4 acres (62.1 ha) |
| Project cost | ₹400 crore |
| Village / locality | Bahesar |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00300 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Feb 2024 (this page) | Environmental approval granted | 153.4 acres | ₹400 crore |
| Early planning filed 27 May 2023 | Cleared for impact study | 153.4 acres | ₹400 crore |
| Early planning filed 3 Mar 2023 | Lapsed | 47.9 acres | ₹400 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 153.4 acres, this one is larger than 88% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bahesar, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield steel plant comprising of DRI Kilns (2 x 500 TPD) –… — cleared for impact study, 0 m away
- Explosive Storage at Tilda, Raipur District of Chhattisgarh State — in-principle approval, conditions pending, 2 km away
- Biladi Limestone Quarry — withdrawn, 2.9 km away
- Biladi Low Grade Limestone Quarry — environmental approval granted, 2.9 km away
- Nikunj Patel — lapsed, 2.9 km away
- Proposed Greenfield Project to Produce Sponge Iron - 62700 TPA through DRI… — environmental approval granted, 3.3 km away
- Greenfield Project of 60 KLPD Grain Based Ethanol Plant by Shri. Sanjay Gupta… — environmental approval granted, 4.7 km away
- Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces,… — environmental approval granted, 5.7 km away
More from Shaurya Ispat Udyog Private Limited in Raipur
- Request for Amendment to the Environmental Clearance (Ec) to Permit the… — environmental approval granted
- For proposed "Change in the DRI plant configuration from 2x500 TPD DRI Kilns… — initial checks
All 6 Shaurya Ispat Udyog projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.