What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raipur, Chhattisgarh

Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant (1x0.6 MTPA) 6,00,000 TPA, Gasifier (Producer gas) 3x6500 Nm3/hr, DRI Kilns (3x350 TPD) 3,46,500 TPA, WHRB Power through DRI kilns – (3 x 8.75 MW)-26.25 MW and CFBC/AFBC based Power Plant of (2x25 MW) 50 MW, SMS – IF (8 x 20 T) with 6/11 CCM 3 Strand x 2Nos (Hot Billets/Ingots/Billets)5,13,920 TPA,Rolling Mill (2x0.25 MTPA) 5,00,000 TPA [(Rolled products) through Hot charging by Shri Baba Baidnath Ispat Pvt Ltd (Unit-2

Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant (1x0.6 MTPA) 6,00,000 TPA, Gasifier (Producer gas) 3x6500 Nm3/hr, DRI Kilns (3x350 TPD) 3,46,500 TPA, WHRB Power through DRI kilns – (3 x 8.75 MW)-26.25 MW and CFBC/AFBC based Power Plant of (2x25 MW) 50 MW, SMS – IF (8 x 20 T) with 6/11 CCM 3 Strand x 2Nos (Hot Billets/Ingots/Billets)5,13,920 TPA,Rolling Mill (2x0.25 MTPA) 5,00,000 TPA [(Rolled products) through Hot charging by Shri Baba Baidnath Ispat Pvt Ltd (Unit-2 is a proposed industrial project in Gaitra, Tilda, Raipur, Chhattisgarh. The site covers 305.5 acres. Its stated project cost is ₹980 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Oct 2024).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant (1x0.6 MTPA) 6,00,000 TPA, Gasifier (Producer gas) 3x6500 Nm3/hr, DRI Kilns (3x350 TPD) 3,46,500 TPA, WHRB Power through DRI kilns – (3 x 8.75 MW)-26.25 MW and CFBC/AFBC based Power Plant of (2x25 MW) 50 MW, SMS – IF (8 x 20 T) with 6/11 CCM 3 Strand x 2Nos (Hot Billets/Ingots/Billets)5,13,920 TPA,Rolling Mill (2x0.25 MTPA) 5,00,000 TPA [(Rolled products) through Hot charging by Shri Baba Baidnath Ispat Pvt Ltd (Unit-2 is a proposed industrial project in Gaitra, Tilda, Raipur, Chhattisgarh. The site covers 305.5 acres.

Who is building it?

The applicant is Shri Baba Baidnath Ispat Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 24 Oct 2024), as of 27 Nov 2026.

Where is it?

In Gaitra, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹980 crore and a site of 305.5 acres.

When was it filed?

The application was filed on 16 Oct 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant (1x0.6 MTPA)…

Project details

StatusCleared for impact study
Status since24 Oct 2024
Application filed16 Oct 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShri Baba Baidnath Ispat Private Limited
Land area305.5 acres (123.6 ha)
Project cost₹980 crore
Village / localityGaitra
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01591

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Oct 2025Environmental approval granted305.5 acres₹980 crore
Early planning filed 16 Oct 2024 (this page)Cleared for impact study305.5 acres₹980 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 305.5 acres, this one is larger than 96% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gaitra, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shri Baba Baidnath Ispat Private Limited in Raipur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.