Quick answers
What is this project?
Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant (1x0.6 MTPA) 6,00,000 TPA, Gasifier (Producer gas) 3x6500 Nm3/hr, DRI Kilns (3x350 TPD) 3,46,500 TPA, WHRB Power through DRI kilns – (3 x 8.75 MW)-26.25 MW and CFBC/AFBC based Power Plant of (2x25 MW) 50 MW, SMS – IF (8 x 20 T) with 6/11 CCM 3 Strand x 2Nos (Hot Billets/Ingots/Billets)5,13,920 TPA,Rolling Mill (2x0.25 MTPA) 5,00,000 TPA [(Rolled products) through Hot charging by Shri Baba Baidnath Ispat Pvt Ltd (Unit-2 is a proposed industrial project in Gaitra, Tilda, Raipur, Chhattisgarh. The site covers 305.5 acres.
Who is building it?
The applicant is Shri Baba Baidnath Ispat Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Oct 2024), as of 27 Nov 2026.
Where is it?
In Gaitra, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹980 crore and a site of 305.5 acres.
When was it filed?
The application was filed on 16 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant (1x0.6 MTPA)…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Oct 2024 |
| Application filed | 16 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shri Baba Baidnath Ispat Private Limited |
| Land area | 305.5 acres (123.6 ha) |
| Project cost | ₹980 crore |
| Village / locality | Gaitra |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01591 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Oct 2025 | Environmental approval granted | 305.5 acres | ₹980 crore |
| Early planning filed 16 Oct 2024 (this page) | Cleared for impact study | 305.5 acres | ₹980 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 305.5 acres, this one is larger than 96% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gaitra, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed I/O Beneficiation Plant (1x 0.7 MTPA) 7,00,000 TPA, Pellet Plant… — environmental approval granted, 0 m away
- DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS… — environmental approval granted, 1.7 km away
- DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS… — cleared for impact study, 2.1 km away
- Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant… — environmental approval granted, 2.1 km away
- Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant… — cleared for impact study, 2.1 km away
- DRI Kilns (Sponge Iron 2,31,000 TPA), Induction Furnace with LRF & CCM (MS… — cleared for impact study, 3.2 km away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 4.6 km away
- Proposed 120 KLPD Grain Based Distillery Plant (Ethanol) — under environmental review, 4.6 km away
More from Shri Baba Baidnath Ispat Private Limited in Raipur
- Project by Shri Baba Baidnath Ispat Private Limited — initial checks
- Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant… — environmental approval granted
- Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.