DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS Billets / Ingots) (1,18,800 TPA), Submerged Electric Arc Furnace (Si-Mn) – 15840 TPA or (Fe-Mn) – 20130 TPA, WHRB based Power Plant – 2 x 5 MW, AFBC based Power Plant – 1 x 5 MW, Brick Manufacturing unit (8,000 Bricks/day)

DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS Billets / Ingots) (1,18,800 TPA), Submerged Electric Arc Furnace (Si-Mn) – 15840 TPA or (Fe-Mn) – 20130 TPA, WHRB based Power Plant – 2 x 5 MW, AFBC based Power Plant – 1 x 5 MW, Brick Manufacturing unit (8,000 Bricks/day) is a proposed industrial project in Chhapora, Tilda, Raipur, Chhattisgarh. The site covers 90.2 acres. Its stated project cost is ₹253.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 2 Aug 2024).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS Billets / Ingots) (1,18,800 TPA), Submerged Electric Arc Furnace (Si-Mn) – 15840 TPA or (Fe-Mn) – 20130 TPA, WHRB based Power Plant – 2 x 5 MW, AFBC based Power Plant – 1 x 5 MW, Brick Manufacturing unit (8,000 Bricks/day) is a proposed industrial project in Chhapora, Tilda, Raipur, Chhattisgarh. The site covers 90.2 acres.

Who is building it?

The applicant is Baidyanath Steel & Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 2 Aug 2024), as of 27 Nov 2026.

Where is it?

In Chhapora, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹253.6 crore and a site of 90.2 acres.

When was it filed?

The application was filed on 8 Jun 2024.

Project details

Official titleEstablishment of DRI Kilns (Sponge Iron 1,32,000 TPA), Induction Furnace with LRF & CCM (MS Billets / Ingots) (1,18,800 TPA), Submerged Electric Arc Furnace (Si-Mn) – 15840 TPA or (Fe-Mn) – 20130 TPA, WHRB based Power Plant – 2 x 5 MW, AFBC based Power Plant – 1 x 5 MW, Brick Manufacturing unit (8,000 Bricks/day) at Village-Chhapora, Tehsil-Tilda, District-Raipur, Chhattisgarh.
StatusCleared for impact study
Status since2 Aug 2024
Application filed8 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBaidyanath Steel & Power Private Limited
Land area90.2 acres (36.5 ha)
Project cost₹253.6 crore
Village / localityChhapora
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01744

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Apr 2025Environmental approval granted58.3 acres₹253.6 crore
Early planning filed 8 Jun 2024 (this page)Cleared for impact study90.2 acres₹253.6 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 90.2 acres, this one is larger than 82% of them.

12 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chhapora, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.