Quick answers
What is this project?
Applying for "No increase in Pollution Load Certificate" for increase of Production capacity of existing DRI plant of 6 x 250 TPD Kilns from 4,95,000 TPA to 5,52,090 TPA Capacity as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed industrial project in Tara\Mal, Tamnar, Raigarh, Chhattisgarh. The site covers 108.1 acres.
Who is building it?
The applicant is B.S.Sponge Private LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Tara\Mal, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹384 crore and a site of 108.1 acres.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | B.S.Sponge Private LTD |
| Land area | 108.1 acres (43.7 ha) |
| Project cost | ₹384 crore |
| Village / locality | Tara\Mal |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02389 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 108.1 acres, this one is larger than 58% of them.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tara\Mal, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environment Clearance (EC) from B.S. Sponge Private Limited to… — under environmental review, 0 m away
- Increase in Production Capacity of Ferro Alloys (Silico Manganese From 30,000… — initial checks, 0 m away
- Proposed "Establishment of new DI pipe unit of 2,00,000 TPA Capacity without… — initial checks, 650 m away
- Proposed "Establishment of new DI pipe unit of 2,00,000 TPA Capacity without… — initial checks, 650 m away
- Transfer of Environment Clearance from M/s. Singhal Enterprises Pvt. Ltd. to… — environmental approval granted, 750 m away
- Amendment in EC for Amalgamation of M/s. Singhal Energy Pvt. Ltd — environmental approval granted, 750 m away
- Raigarh-Gharghoda — lapsed, 1.1 km away
- Laying of 33KVA Dedicated Line Banjari to Punjipathra — lapsed, 1.3 km away
More from B.S.Sponge Private LTD in Raigarh
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — under environmental review
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — cleared for impact study
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — cleared for impact study
- Increase in Production Capacity of Ferro Alloys (Silico Manganese From 30,000… — initial checks
- Greenfield steel plant by B.S.Sponge Pvt.Ltd. (Badgaon Unit)-Sponge… — cleared for impact study
- 132 KV DCSS transmission line from CSPTCL 220/132 KV S/s Gerwani to M/s… — lapsed
All 9 B.S.Sponge projects across India