Quick answers
What is this project?
Change in Name From "ispat India" to "hindustan Structural Pipes Limited" Due to Change in Constitution From "partnership Firm" to "limited" Company is an approved industrial project in Siltara (Ct), Raipur, Chhattisgarh. The site covers 5.8 acres.
Who is building it?
The applicant is Hindustan Structural Pipes Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Oct 2025), as of 27 Nov 2026.
Where is it?
In Siltara (Ct), Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹65.8 crore and a site of 5.8 acres.
When was it filed?
The application was filed on 28 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Oct 2025 |
| Application filed | 28 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Hindustan Structural Pipes Limited |
| Land area | 5.8 acres (2.4 ha) |
| Project cost | ₹65.8 crore |
| Village / locality | Siltara (Ct) |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02499 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.8 acres, this one is smaller than 72% of them.
54 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Siltara (Ct), Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Manufacturing capacity Ferro Alloys from 8,000 TPA to 19,000 TPA… — environmental approval granted, 550 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — environmental approval granted, 600 m away
- Expansion of Existing Production Unit (Under Para 7(II) (a) as per EIA… — lapsed, 600 m away
- Expansion Of Sponge Iron Production And Whrb Power Without Increase In… — initial checks, 600 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — withdrawn, 600 m away
- Expansion of Steel Plant–DRI Kilns(Sponge Iron- 66,000 to 86,940 TPA &… — cleared for impact study, 650 m away
- Industrial project by Trimurti Re-Rollers Pvt. Ltd. — withdrawn, 1 km away
- Expansion of production facilities of Induction Furnace with CCM from existing… — lapsed, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.