Quick answers
What is this project?
Expansion Of Sponge Iron Production And Whrb Power Without Increase In Pollution Load at Siltara Industrial Growth Center, Phase II, Siltara, District- Raipur, Chhattisgarh- 492003 By M/s Vandana Global Limited is a proposed power project in Sankra, Raipur, Chhattisgarh. The site covers 56.9 acres.
Who is building it?
The applicant is Vandana Global Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Sankra, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹362 crore and a site of 56.9 acres.
When was it filed?
The application was filed on 24 Dec 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 24 Dec 2024 |
| Application filed | 24 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Vandana Global Limited |
| Land area | 56.9 acres (23 ha) |
| Project cost | ₹362 crore |
| Village / locality | Sankra |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01943 |
In context
13 applications in Raipur since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 56.9 acres, this one is smaller than 77% of them.
63 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sankra, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Production Unit (Under Para 7(II) (a) as per EIA… — lapsed, 0 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — withdrawn, 0 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — environmental approval granted, 0 m away
- Expansion of Steel Plant–DRI Kilns(Sponge Iron- 66,000 to 86,940 TPA &… — cleared for impact study, 400 m away
- Expansion of Manufacturing capacity Ferro Alloys from 8,000 TPA to 19,000 TPA… — environmental approval granted, 600 m away
- Change in Name From "ispat India" to "hindustan Structural Pipes Limited" Due… — environmental approval granted, 600 m away
- Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA… — environmental approval granted, 600 m away
- Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA… — lapsed, 600 m away
More from Vandana Global Limited in Raipur
- Expansion of Existing Production Unit (Under Para 7(II) (a) as per EIA… — lapsed
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — environmental approval granted
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — withdrawn
All 4 Vandana Global projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.