Quick answers
What is this project?
Expansion of Steel Plant–DRI Kilns(Sponge Iron- 66,000 to 86,940 TPA & 1,05,000 to 1,52,145 TPA),IF(MS Billets/Ingots)-1,15,200 to 1,72,500 TPA, Re-Rolling Mill (TMT Bars/Structural Steel Strips)-1,20,000 to 1,68,000 TPA,PGP–5600 Nm3/hr, WHRB-6.0 to 7.5 MW & 8.0 to 10MW, Non-conventional Fuel (Rice Husk) CPP-12 MW, SEAFs-2x6 MVA-2x13,200 to 2x14,520 TPA is a proposed industrial project in Siltara (Ct), Raipur, Chhattisgarh. The site covers 29.3 acres.
Who is building it?
The applicant is Shree Nakoda Ispat Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Oct 2026), as of 27 Nov 2026.
Where is it?
In Siltara (Ct), Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹197 crore and a site of 29.3 acres.
When was it filed?
The application was filed on 9 Sept 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shree Nakoda Ispat Limited |
| Land area | 29.3 acres (11.9 ha) |
| Project cost | ₹197 crore |
| Village / locality | Siltara (Ct) |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03349 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.3 acres, this one is larger than 52% of them.
63 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Siltara (Ct), Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Production Unit (Under Para 7(II) (a) as per EIA… — lapsed, 400 m away
- Expansion Of Sponge Iron Production And Whrb Power Without Increase In… — initial checks, 400 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — withdrawn, 400 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — environmental approval granted, 400 m away
- Change in Name From "ispat India" to "hindustan Structural Pipes Limited" Due… — environmental approval granted, 650 m away
- Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA… — environmental approval granted, 750 m away
- Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA… — lapsed, 750 m away
- Expansion of Manufacturing capacity Ferro Alloys from 8,000 TPA to 19,000 TPA… — environmental approval granted, 900 m away