Quick answers
What is this project?
Expansion of Existing Production Unit at Siltara Industrial Growth Center, Phase-II, Siltara, District- Raipur, Chhattisgarh-492003 by M/s Vandana Global Limited is a withdrawn industrial project in Sankra, Raipur, Chhattisgarh. The site covers 56.9 acres.
Who is building it?
The applicant is Vandana Global Limited.
Has it been approved?
No. The application was withdrawn on 21 Apr 2024, so it is no longer under consideration.
Where is it?
In Sankra, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹362 crore and a site of 56.9 acres.
When was it filed?
The application was filed on 13 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Existing Production Unit at Siltara Industrial Growth Center, Phase-II,…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 21 Apr 2024 |
| Application filed | 13 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Vandana Global Limited |
| Land area | 56.9 acres (23 ha) |
| Project cost | ₹362 crore |
| Village / locality | Sankra |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02207 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 16 May 2024 | Environmental approval granted | 56.9 acres | ₹362 crore |
| Early planning filed 13 Apr 2024 (this page) | Withdrawn | 56.9 acres | ₹362 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 56.9 acres, this one is larger than 74% of them.
62 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sankra, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Production Unit (Under Para 7(II) (a) as per EIA… — lapsed, 0 m away
- Expansion Of Sponge Iron Production And Whrb Power Without Increase In… — initial checks, 0 m away
- Expansion of Existing Production Unit at Siltara Industrial Growth Center,… — environmental approval granted, 0 m away
- Expansion of Steel Plant–DRI Kilns(Sponge Iron- 66,000 to 86,940 TPA &… — cleared for impact study, 400 m away
- Expansion of Manufacturing capacity Ferro Alloys from 8,000 TPA to 19,000 TPA… — environmental approval granted, 600 m away
- Change in Name From "ispat India" to "hindustan Structural Pipes Limited" Due… — environmental approval granted, 600 m away
- Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA… — environmental approval granted, 600 m away
- Expansion of Steel plant by increase in Sponge Iron capacity from 60,000 TPA… — lapsed, 600 m away
More from Vandana Global Limited in Raipur
- Expansion of Existing Production Unit (Under Para 7(II) (a) as per EIA… — lapsed
- Expansion Of Sponge Iron Production And Whrb Power Without Increase In… — initial checks
All 4 Vandana Global projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.