Quick answers
What is this project?
Expansion of existing Plant with Augmentation of existing Induction Furnace (10 MT to 15 MT) and addition of New Induction Furnace (2 X 15 MT) for additional production of M.S Ingots/ Billets from 158400 TPA to 386100 TPA and Rolled Steel Product from 150480 TPA to 359100 MTPA and Production of HB Wire of capacity 60000 TPA is a rejected industrial project in Akoli, Raipur, Chhattisgarh. The site covers 8.7 acres.
Who is building it?
The applicant is Hindustan Coils Limited.
Has it been approved?
No. The application was rejected on 25 Dec 2025.
Where is it?
In Akoli, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹48.9 crore and a site of 8.7 acres.
When was it filed?
The application was filed on 24 Mar 2025.
Project details
| Status | Not approved |
|---|---|
| Status since | 25 Dec 2025 |
| Application filed | 24 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hindustan Coils Limited |
| Land area | 8.7 acres (3.5 ha) |
| Project cost | ₹48.9 crore |
| Village / locality | Akoli |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02509 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.7 acres, this one is smaller than 62% of them.
40 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akoli, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Plant with Augmentation of existing Induction Furnace… — cleared for impact study, 0 m away
- Amendment in Environmental Clearance for Enhancement in Power Generation… — withdrawn, 750 m away
- Amendment in Environmental Clearance for Enhancement in Power Generation… — lapsed, 750 m away
- Amendment in Environmental Clearance for Enhancement in Power Generation… — returned to applicant, 750 m away
- Expansion & Modernization of Integrated Steel Plant-BF–0.75 to 2.0 MTPA (0.75… — environmental approval granted, 1.7 km away
- Expansion & Modernization of Integrated Steel Plant-BF–0.75 to 2.0 MTPA (0.75… — more information requested, 1.7 km away
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — environmental approval granted, 1.8 km away
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — cleared for impact study, 1.8 km away
More from Hindustan Coils Limited in Raipur
- Expansion of existing Plant with Augmentation of existing Induction Furnace… — cleared for impact study