What is Developing? Open the mapMap

Environmental approval grantedIndustry · Raipur, Chhattisgarh

Expansion & Modernization of Integrated Steel Plant-BF–0.75 to 2.0 MTPA (0.75 to 1 MTPA through modernization),Sinter Plant–0.8 to 2.8 MTPA, Pellet Plant–1.5 to 3.0 MTPA,Coke Oven-0.2 to 1.1 MTPA,Oxygen Plant–510 to 1500 TPD, SMS-1.2 to 2.4 MTPA, RM–1.2 to 2.4 MTPA,Cement Grinding unit–2.4 MTPA,PGP-1,16,000 Nm3/hr, Power Plant–26 to 130 MW(104 MW–BF GAS & COKE OVEN GAS), Under CTE/CTO-DRI (350 +500 TPD)-0.27 MTPA(0.12 +0.15) to 0.35 MTPA,Power plant–30 MW (2x15 MW WHRB & AFBC)

Expansion & Modernization of Integrated Steel Plant-BF–0.75 to 2.0 MTPA (0.75 to 1 MTPA through modernization),Sinter Plant–0.8 to 2.8 MTPA, Pellet Plant–1.5 to 3.0 MTPA,Coke Oven-0.2 to 1.1 MTPA,Oxygen Plant–510 to 1500 TPD, SMS-1.2 to 2.4 MTPA, RM–1.2 to 2.4 MTPA,Cement Grinding unit–2.4 MTPA,PGP-1,16,000 Nm3/hr, Power Plant–26 to 130 MW(104 MW–BF GAS & COKE OVEN GAS), Under CTE/CTO-DRI (350 +500 TPD)-0.27 MTPA(0.12 +0.15) to 0.35 MTPA,Power plant–30 MW (2x15 MW WHRB & AFBC) is an approved industrial project in Dhaneli, Raipur, Chhattisgarh. The site covers 1,189.3 acres. Its stated project cost is ₹14,283.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 2 Mar 2023).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion & Modernization of Integrated Steel Plant-BF–0.75 to 2.0 MTPA (0.75 to 1 MTPA through modernization),Sinter Plant–0.8 to 2.8 MTPA, Pellet Plant–1.5 to 3.0 MTPA,Coke Oven-0.2 to 1.1 MTPA,Oxygen Plant–510 to 1500 TPD, SMS-1.2 to 2.4 MTPA, RM–1.2 to 2.4 MTPA,Cement Grinding unit–2.4 MTPA,PGP-1,16,000 Nm3/hr, Power Plant–26 to 130 MW(104 MW–BF GAS & COKE OVEN GAS), Under CTE/CTO-DRI (350 +500 TPD)-0.27 MTPA(0.12 +0.15) to 0.35 MTPA,Power plant–30 MW (2x15 MW WHRB & AFBC) is an approved industrial project in Dhaneli, Raipur, Chhattisgarh. The site covers 1,189.3 acres.

Who is building it?

The applicant is Jayaswal Neco Industries Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 2 Mar 2023), as of 27 Nov 2026.

Where is it?

In Dhaneli, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹14,283.9 crore and a site of 1,189.3 acres.

When was it filed?

The application was filed on 2 Mar 2023.

Project details

StatusEnvironmental approval granted
Status since2 Mar 2023
Application filed2 Mar 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantJayaswal Neco Industries Limited
Land area1,189.3 acres (481.3 ha)
Project cost₹14,283.9 crore
Village / localityDhaneli
Taluk / tehsilRaipur
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00560

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,189.3 acres, this one is larger than 99% of them.

50 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhaneli, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jayaswal Neco Industries Limited in Raipur

All 12 Jayaswal Neco Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.