Quick answers
What is this project?
Amendment in Environmental Clearance for Enhancement in Power Generation Capacity from Restricted Capacity of 81.5 MW to 98.7 MW is a proposed power project in Siltara, Raipur, Chhattisgarh. The site covers 167.9 acres.
Who is building it?
The applicant is Sarda Energy and Minerals Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Siltara, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹42.9 crore and a site of 167.9 acres.
When was it filed?
The application was filed on 21 Jun 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 7 Apr 2025 |
| Application filed | 21 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Sarda Energy and Minerals Limited |
| Land area | 167.9 acres (68 ha) |
| Project cost | ₹42.9 crore |
| Village / locality | Siltara |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01866 |
In context
13 applications in Raipur since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 167.9 acres, this one is smaller than 69% of them.
49 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Siltara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance for Enhancement in Power Generation… — withdrawn, 0 m away
- Amendment in Environmental Clearance for Enhancement in Power Generation… — lapsed, 0 m away
- Expansion of existing Plant with Augmentation of existing Induction Furnace… — cleared for impact study, 750 m away
- Expansion of existing Plant with Augmentation of existing Induction Furnace… — not approved, 750 m away
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — environmental approval granted, 1.1 km away
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — cleared for impact study, 1.1 km away
- Expansion Proposal of Iron Ore Beneficiation Plant from 3.284 MTPA to 5.657… — environmental approval granted, 1.1 km away
- Enhancement in production of Sponge Iron from 650000 TPA to 715000 TPA through… — initial checks, 1.1 km away
3 Sarda Energy & Minerals projects in Raipur
All 20 Sarda Energy & Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.