Environmental approval grantedIndustry · Raigarh, Chhattisgarh

Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500 TPA), WHRB based Power Plant from 4 MW to 34 MW, FBC based Power Plant from 4 MW to 24 MW, Induction Furnaces

Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500 TPA), WHRB based Power Plant from 4 MW to 34 MW, FBC based Power Plant from 4 MW to 24 MW, Induction Furnaces is an approved industrial project in Delari, Raigarh, Chhattisgarh. The site covers 154.8 acres. Its stated project cost is ₹544 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 May 2025).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500 TPA), WHRB based Power Plant from 4 MW to 34 MW, FBC based Power Plant from 4 MW to 24 MW, Induction Furnaces is an approved industrial project in Delari, Raigarh, Chhattisgarh. The site covers 154.8 acres.

Who is building it?

The applicant is Maa Kali Alloys Udyog Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 May 2025), as of 27 Nov 2026.

Where is it?

In Delari, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹544 crore and a site of 154.8 acres.

When was it filed?

The application was filed on 4 Apr 2025.

Project details

Official titleExpansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500 TPA), WHRB based Power Plant from 4 MW to 34 MW, FBC based Power Plant from 4 MW to 24 MW, Induction Furnaces along with CCM & LRF (Hot Billets / MS Billets / Ingots from 56,000 TPA to 3,72,800 TPA), New Rolling Mill (Rolled Product) – 3,96,000 TPA, Coal Gasifier for Reheating Furnace – 3,500 NM3/Hr., New Ferro Alloys Unit (2 x 9 MVA) to produce FeSi - 14,000 TPA / FeMn - 50,400 TPA / SiMn -28,800 TPA / FeCr - 30,000
StatusEnvironmental approval granted
Status since26 May 2025
Application filed4 Apr 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantMaa Kali Alloys Udyog Private Limited
Land area154.8 acres (62.7 ha)
Project cost₹544 crore
Village / localityDelari
Taluk / tehsilRaigarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02866

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 4 Apr 2025 (this page)Environmental approval granted154.8 acres₹544 crore
Early planning filed 24 Nov 2023Cleared for impact study154.8 acres₹544 crore

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 154.8 acres, this one is larger than 66% of them.

49 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Delari, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.