Quick answers
What is this project?
132KV Transmission Line from CSPTCL 220/132/33 KV Substation Gerwani to M/s Shree Rupanadham Steel Pvt. Ltd. Dist - Raigarh (C.G.) is a lapsed power project in Delari, Raigarh, Chhattisgarh. The site covers 63.6 acres.
Who is building it?
The applicant is Shree Rupanadham Steel Private Limited.
Has it been approved?
No. The application was lapsed on 27 Apr 2025, so it is no longer under consideration.
Where is it?
In Delari, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹3.2 crore; a site of 63.6 acres and 5.5 acres (2.2 ha) of forest land.
When was it filed?
The application was filed on 5 Dec 2023.
Project details
| Official title | Construction of 132KV Transmission Line from CSPTCL 220/132/33 KV Substation Gerwani to M/s Shree Rupanadham Steel Pvt. Ltd. Dist - Raigarh (C.G.) |
|---|---|
| Status | Lapsed |
| Status since | 27 Apr 2025 |
| Application filed | 5 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Shree Rupanadham Steel Private Limited |
| Land area | 63.6 acres (25.7 ha) |
| Forest land | 5.5 acres (2.2 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Delari |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03765 |
In context
29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 63.6 acres, this one is smaller than 82% of them.
57 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Delari, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendments in Existing E.C. Issued to M/S. Raigarh Ispat PVT. LTD. Vide… — returned to applicant, 750 m away
- Expansion of Steel Plant–Sponge Iron from 1,20,000 TPA to 4,17,000 TPA, MS… — cleared for impact study, 800 m away
- TOR amendment -Request for TOR amendment to Exempt Violation for our 90,000… — lapsed, 900 m away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500… — environmental approval granted, 1.4 km away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000 TPA to 4,06,500… — cleared for impact study, 1.4 km away
- 2 X 95 Tpd Dri Kilns to Manufacture 62,700 Tpa of Sponge Iron, 2 X 3.0 MW of… — environmental approval granted, 1.7 km away
- 132KV Transmission Line from CSPTCL 220/132/33KV Substation Gerwani to M/s… — lapsed, 1.9 km away
- Diversion of Forest Land Proposed for Non-Forest Purpose Under Vss (Van… — lapsed, 2.1 km away