Quick answers
What is Industrial project by Indoves Industrial Private Limited?
This lapsed industrial project by Indoves Industrial Private Limited is in Jamgaon, Raigarh, Chhattisgarh. The site covers 16.1 acres.
Who is building it?
The applicant is Indoves Industrial Private Limited.
Has it been approved?
No. The application was lapsed on 29 Sept 2023, so it is no longer under consideration.
Where is it?
In Jamgaon, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹495.9 crore; a site of 16.1 acres and 1.2 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 10 Jan 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Sept 2023 |
| Application filed | 10 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Indoves Industrial Private Limited |
| Land area | 16.1 acres (6.5 ha) |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹495.9 crore |
| Village / locality | Jamgaon |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04158 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.1 acres, this one is smaller than 77% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamgaon, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — under environmental review, 1.2 km away
- For Proposed Change in Configuration of Induction Furnace in SMS -1 (from 1X18… — initial checks, 1.2 km away
- For Proposed "Change in the (SMS#2 plant) configuration of Induction Furnaces… — initial checks, 1.2 km away
- Industrial project by Msp Steel & Power Limited — environmental approval granted, 1.2 km away
- No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA… — initial checks, 1.2 km away
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — withdrawn, 1.2 km away
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks, 1.2 km away
- Diversion of Revenue forest land Proposed for 2x800 MW Ultra Super Critical… — forest land use approved, 2 km away