What is this project?
Diversion of Revenue forest land Proposed for 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited is an approved building project in Deori, Raigarh, Chhattisgarh. The site covers 2,736 acres.
Who is building it?
The applicant is Torrent Power Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Sept 2026), as of 27 Nov 2026.
Where is it?
In Deori, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹22,915.1 crore; a site of 2,736 acres and 85.6 acres (34.6 ha) of forest land.
When was it filed?
The application was filed on 20 Aug 2026.
Project details
| Official title | Diversion of Revenue forest land Proposed for 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited at Deori & Dumarpali village in Raigarh District of Chhattisgarh |
|---|---|
| Status | Forest land use approved |
| Status since | 18 Sept 2026 |
| Application filed | 20 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Torrent Power Limited |
| Land area | 2,736 acres (1,107.2 ha) |
| Forest land | 85.6 acres (34.6 ha) |
| Project cost | ₹22,915.1 crore |
| Village / locality | Deori |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04065 |
In context
13 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 3 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 2,736 acres, this one is larger than 92% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Deori, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Indoves Industrial Private Limited — lapsed, 2 km away
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — under environmental review, 3.2 km away
- For Proposed Change in Configuration of Induction Furnace in SMS -1 (from 1X18… — initial checks, 3.2 km away
- For Proposed "Change in the (SMS#2 plant) configuration of Induction Furnaces… — initial checks, 3.2 km away
- Industrial project by Msp Steel & Power Limited — environmental approval granted, 3.2 km away
- No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA… — initial checks, 3.2 km away
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — withdrawn, 3.2 km away
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks, 3.2 km away
More from Torrent Power Limited in Raigarh
- Proposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s… — cleared for impact study
5 Torrent Power projects in Raigarh
All 28 Torrent Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.