Under environmental reviewIndustry · Raigarh, Chhattisgarh

Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD. Pertaining to Change in Fbc Based Power Plant Capacity From 20 MW to 80 MW and Installation of New Eof Unit (1 X 50 T) and New Vacuum Degassing Unit (1 X 50 T) in the Plant Configuration for the Proposed Steel Plant at Patarapali, Kotarliya & Siyarpali Villages, Raigarh Tehsil & District, Chhattisgarh

Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD. Pertaining to Change in Fbc Based Power Plant Capacity From 20 MW to 80 MW and Installation of New Eof Unit (1 X 50 T) and New Vacuum Degassing Unit (1 X 50 T) in the Plant Configuration for the Proposed Steel Plant at Patarapali, Kotarliya & Siyarpali Villages, Raigarh Tehsil & District, Chhattisgarh is a proposed industrial project in Patrapali, Raigarh, Chhattisgarh. The site covers 75.9 acres. Its stated project cost is ₹1,170 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 25 Nov 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD. Pertaining to Change in Fbc Based Power Plant Capacity From 20 MW to 80 MW and Installation of New Eof Unit (1 X 50 T) and New Vacuum Degassing Unit (1 X 50 T) in the Plant Configuration for the Proposed Steel Plant at Patarapali, Kotarliya & Siyarpali Villages, Raigarh Tehsil & District, Chhattisgarh is a proposed industrial project in Patrapali, Raigarh, Chhattisgarh. The site covers 75.9 acres.

Who is building it?

The applicant is Singhal Steel Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Patrapali, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹1,170 crore and a site of 75.9 acres.

When was it filed?

The application was filed on 25 Nov 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD.…

Project details

StatusUnder environmental review
Status since25 Nov 2026
Application filed25 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantSinghal Steel Private Limited
Land area75.9 acres (30.7 ha)
Project cost₹1,170 crore
Village / localityPatrapali
Taluk / tehsilRaigarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-04421

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Nov 2026 (this page)Under environmental review75.9 acres₹1,170 crore
Amendment filed 26 Jun 2025Cleared for impact study75.9 acres₹1,170 crore

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 75.9 acres, this one is smaller than 52% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Patrapali, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Singhal Steel Private Limited in Raigarh

All 4 Singhal Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.