Proposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited

Proposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited is a proposed power project in Charbhatha, Raigarh, Chhattisgarh. The site covers 3,351.5 acres. Its stated project cost is ₹22,915.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Sept 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited is a proposed power project in Charbhatha, Raigarh, Chhattisgarh. The site covers 3,351.5 acres.

Who is building it?

The applicant is Torrent Power Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Sept 2026), as of 27 Nov 2026.

Where is it?

In Charbhatha, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹22,915.1 crore and a site of 3,351.5 acres.

When was it filed?

The application was filed on 22 Jun 2026.

Project details

Official titleProposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s Torrent Power Limited at Deori & Dumarpali village in Raigarh District of Chhattisgarh
StatusCleared for impact study
Status since17 Sept 2026
Application filed22 Jun 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantTorrent Power Limited
Land area3,351.5 acres (1,356.3 ha)
Project cost₹22,915.1 crore
Village / localityCharbhatha
Taluk / tehsilRaigarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03344

In context

29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3,351.5 acres, this one is larger than 93% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Charbhatha, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Torrent Power Limited in Raigarh

5 Torrent Power projects in Raigarh
All 28 Torrent Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.